My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-07-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:58:14 PM
Creation date
7/22/2004 2:42:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
���Si—�c� <br /> ATTACHMENT FIVE <br /> Redwood City Recycled Water Project <br /> Disinfection, Storage and Pumping Facilities <br /> South Bayside System Authority <br /> Construction Management Plan <br /> Construction Manaqement Tasks <br /> • Preparation and updating of Baseline Construction Schedule to monitor <br /> SBSA activities related to site preparation prior to construction. <br /> • Preparation and administration of pre-purchasing of construction materials <br /> including steel sheet piling and other specialty items. <br /> • Preparation of Contractor's pre-qualification documents <br /> • Coordination and oversight of Kennedy/Jenks design (including <br /> attendance at Design Review Meetings, etc.). <br /> • Review Design Documents for constructability, schedule constraints, <br /> contractor requirements and all other construction related items. <br /> • Review of Bid Documents for compatibility with SBSA Standard <br /> Specifications and construction constraints, sequence and criteria. <br /> • Participation during bid period and award recommendation. <br /> • Construction Management, Administration and Observation services <br /> during construction. <br /> • Perform project close-out activities including 12-month warranty, <br /> monitoring and administration. <br /> Staffinq <br /> Design and Pre-Construction Phase: <br /> The Covello Group, Inc. <br /> • Joseph Covello, P.E., Construction Coordinator <br /> • Preparation of pre-purchase documents <br /> • Preparation of Contractor's pre-qualification documents <br /> • Constructability review <br /> • Integration of SBSA specifications into design documents <br /> SBSA Personnel <br /> • Coordination and implementation of activities relating to grading, road <br /> rehabilitation, berm relocation, landscape piping removal, abandon or <br /> relocate #3 water supply line and pond drain <br /> August 1, 2004 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.