My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-07-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:58:14 PM
Creation date
7/22/2004 2:42:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�•� �1l "� <br /> compounded by the need to have the spacing accommodate and maximize the <br /> constructability of the concrete structure. <br /> 4.0 Recommendations <br /> The Recycled Water S#orage Tank Project is an extremely complex design, <br /> which requires integration into the construction sequence of the entire facility. <br /> Wisely, SBSA and the City are designing the cofferdam for the bidders. <br /> By prepurchasing, the City can reduce the construction duration by <br /> approximately three months. More importantly, the uncertainty of having the <br /> material on-site when needed can be mitigated, if not eliminated, and on-site <br /> storage is not an issue. Finally, the price escalation can be reduced by the early <br /> purchase. <br /> This is a decision that requires timely handling so as to prepare the procurement <br /> bidding documents and coordinate the procurement with the design process. To <br /> maintain the current schedule, the actual procurement award would have to be <br /> no later than the September Commission meeting. Approximately two (2) weeks <br /> will be necessary to prepare the bidding documents after the cofferdam design is <br /> finalized at the end of July. A two (2) to three (3) week procurement bidding <br /> period is necessary. <br /> The Covello Group, acting as the Construction Project Manager for SBSA, <br /> strongly recommends that the steel sheet piling be prepurchased for the <br /> Redwood City Recycled Water Storage Tank Project. The decision to <br /> prepurchase the steel bracing will require further analysis of the benefits and <br /> whether raw steel sections or prefabricated steel sections are purchased. There <br /> is approximately a one to two month leeway in making this decision. However, <br /> regardless of the choice of raw or prefabricated steel, it is also recommended <br /> that the option to prepurchase the steel bracing be exercised. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.