My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-06-07
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:18:11 PM
Creation date
6/3/2004 2:57:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 7 . A - I �` <br /> Regarding the last change, staff originally wanted a minimum of 80% of "occupied" <br /> ground level space to promote pedestrian activity. This occupied space could have <br /> included residential or commercial uses. The intent was to "wrap" the exposed two or <br /> three-ston� parking garage facades with active ana interesting spaces because the City <br /> wished to p� �mot� a lot of pedestrian activity within t��e project, and people do not like to <br /> walk along streets with little or no active uses (meaning houses, stores and other uses <br /> that promote people being in the area). The developer argued that their plan, as <br /> designed could not achieve the 80% standard, and the Planning Commission agreed to <br /> modify this condition so as to allow a minimum average of 50% occupied space for the <br /> entire build-out condition. This means that some of the building phases could technically <br /> be below the 50% requirement (e.g. portions of Pete's Harbor) and some could be <br /> higher (e.g. portions of Peninsula Marina). But in no case shall the entire build-out be <br /> below an average of 50%. The definition of "occupied" ground level space was further <br /> expanded to include not only commercial or residential uses, but also could include <br /> attractive stairs, patios, courtyards, and pedestrian entrances to garages. <br /> The staff expressed concem about the extent of inactive ground floor space in the <br /> current project design. It is noted, however, that the Precise Plan is a concept-level <br /> document and that the actual project app�ovals for the various phases of the project will <br /> occur when the developer submits applications for Planned Community Permits <br /> The Precise Plan sets minimum requirements for a conceptual and large-scale design <br /> such as MSV. The implementing tool will be the Planned Community (PC) Permit. The <br /> PC permit will be required at each phase of development. <br /> Density <br /> The current General Plan designation does not permit MSV to be built as proposed. <br /> Both the 1990 General Plan Land Use Element and accompanying land use map list the <br /> maximum net density allowed in Redwood City as 40 units per net acre'. The project's <br /> net residential density is 59 units per net acre or a 47% increase over existing <br /> standards. <br /> While the applicant indicates the intention to build out the entire project, the City has no � <br /> way to guarantee that this will occur. As a result, the Precise Plan is drafted in a <br /> manner that assures a proper mix of uses and that the level of development and density <br /> proposed matches planned infrastructure improvements. <br /> The Precise Plan and the General Plan Amendment permit a baseline density of 40 <br /> units per net acre but also allow a greater density (e.g. 59 units/net acre or 1,930 on-site <br /> units) under the Planned Community Permit, coupled with the Development Agreement. <br /> The City will have to make certain findings to warrant this higher density for the project. <br /> The project, at each phase, would have to demonstrate at least three of the following: <br /> 6 Planned Community Permits are defined in Article 52 of the Zoning Ordinance and are the mechanism for approval <br /> of the various phases of a project approved by a Precise Plan. <br /> � Land Use Element of the Redwood City Strategic General Plan. Page 6-5. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.