My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-10-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:23:00 PM
Creation date
10/21/2004 1:19:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
10/25/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revised Faci I ities Cost Esti mate <br /> $12.0 million — Estimated at planning stage <br /> $14. 0 m i I I i o n— Ref i n ed esti m ate i n 6/04 <br /> $15.6 million —100% design, at mid-point of <br /> construction period <br /> Drivers: <br /> • Concrete and steel prices <br /> • 15% larger storage capacity (materials + <br /> excavati o n, s h o ri n g, etc. ) <br /> • Covers added to pump station and <br /> contact cham ber <br /> • Stand-by power added <br /> • What is the rig ht conti ngency i n th is <br /> m a rket? <br />
The URL can be used to link to this page
Your browser does not support the video tag.