Laserfiche WebLink
Revised Faci I ities Cost Esti mate <br /> $12.0 million — Estimated at planning stage <br /> $14. 0 m i I I i o n— Ref i n ed esti m ate i n 6/04 <br /> $15.6 million —100% design, at mid-point of <br /> construction period <br /> Drivers: <br /> • Concrete and steel prices <br /> • 15% larger storage capacity (materials + <br /> excavati o n, s h o ri n g, etc. ) <br /> • Covers added to pump station and <br /> contact cham ber <br /> • Stand-by power added <br /> • What is the rig ht conti ngency i n th is <br /> m a rket? <br />