My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-08-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2006 3:46:36 PM
Creation date
8/24/2006 12:05:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council & Redevelopment
Date
8/28/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 6.1D <br />Wagstaff and Associates Proposal for Services Page 9 <br />City of Redwood City Peninsula Park. Project EIR Addendum Project <br />July 31,2006 Page 1-6 <br />1.3.2 Pete's Harbor Property Assumptions <br />The current Peninsula Park project application does not Include the 13.21-acre Pete's Harbor <br />property; however, a revised development application is anticipated In the near future for this <br />smaller Pete's Harbor portion of the original Marina Shores Village project area (i.e., during the <br />environmental review process for the Peninsula Park project). Details for the anticipated Pete's <br />Harbor property application have not yet been identified. In order to adequately account for this <br />reasonably foreseeable nearby cumulative development activity, the Addendum will include a <br />"base case" maximum buiJdout assumption for the Pete's Harbor site under its current General <br />Commercial-Combined Residential (CG-R) zoning designation. The assumed Pete's Harbor <br />property development scenario will be identified in consultation with City staff, and for <br />conservative CEQA analysis purposes, will reflect the highest reasonably foreseeable impacts <br />from an environmental standpoint (cumulative traffic, biological resources, hydrology, noise, air <br />quality, etc.) under the current designation--e.g., a residential density of 40 units per acre or <br />some combination of high density residential and general commercial. <br />1.4 KEY ENVIRONMENTAL ISSUES <br />The following environmental topics are expected to be of particular importance to City decision- <br />makers, interested agencies, and the community in their consideration of the currently proposed <br />Peninsula Marina project, and will receive emphasis in the EIR Addendum preparation program: <br />. Visual Factors: The Addendum will describe the potential visual impacts of the <br /> Peninsula Park project in comparison to the 2003 EIR project and 2003 EIR Alternative <br /> 6, including the comparative effects of the revised maximum building heights, number of <br /> towers and building layout, site coverage, open space provisions, relationship to the <br /> EIR-identified 50-foot "visual plane" of the existing Bayfront Area development, etc. The <br /> comparative evaluation will be completed with the assistance of Terry Bottomley, urban <br /> designer, of Bottomley Design and Planning (Terry Bottomley provided similar <br /> assistance in preparing the "Visual Factors" analysis component of the 2003 EIR). <br /> Section 3 of this proposal, Proposed Budget and Compensation, includes 20 hours of <br /> Terry Bottomley's time to provide this assistance. Emphasis will be placed in the visual <br /> impacts comparison on comparative effects on sky and distant views through the site, <br /> surrounding public views and view corridors, and shadow impacts on adjacent land <br /> uses. Any remaining (reduced) visual mitigation fequirements fOf the currently-proposed <br /> Peninsula Park project will then be identified. <br /> Photomontage Visual Simulations (optional). The 2003 EaR included computer- <br /> generated photomontage -before and after" visual simulations of the proposed project <br /> (building heights up to 260 feet) and project Alternative 6 (building heights up to 240 <br /> feet) from four (4) viewpoints: Bair Island, southbound Highway 101 near Whipple <br /> Avenue, northbound Highway 101 at Seaport Boulevard, and the elevated Maple Street <br /> overcrossing of Highway 101. Although the currently proposed Peninsula Park project <br /> includes a substantially reduced building height maximum (120 feet) and therefore may <br /> not require preparation of rev/sed photomontage visual simulations for CEOA <br /> compliance purposes, City staff and the applicant may agree that preparation of revised <br /> simulations of the current reduced-height project from two (2) or more of the previously- <br /> simulated viewpoints may be warranted for informational purposes--Le., to illustrate and <br /> verify the mitigating effects of the current project. <br />C:\Documents and Setlings'jekislLocaJ Settings\ T emporaty Inf8met Files10LK5C\0602 proposal section 1-rev.doc <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.