Laserfiche WebLink
<br /><&ITT Industries <br /> <br />IIT Flygt CorponlUon <br />790-A Chadbourne Road <br />Fairfield. CA 94534 <br />Tel: (707) 422-9894 <br />Fax: (107) 422-9808 <br /> <br />SCHEDULED PUMP PREVENTATIVE MAINTENANCE INSPECTION AGREEMENT <br />FLYGT CORPORATION <br /> <br />SERVICE - 21 POINT CHECK LIST <br /> <br />o Check electrical condition of insulation on power cable and on all phases of motor. (In Meg Dbms) <br /> <br />o Check for any loose or faulty electrical connections within the pump control panel. <br /> <br />o Measure resistance between stator windings. (In Ohms) <br /> <br />o Check voltage supply between all phases of the electrical control panel. r.r AC) <br /> <br />o Check voltage balance between all phases on the load side. of the pump control with pump on. 01 AC) <br /> <br />o Check amperage draws on all phases of the pump motor. (In Amps) <br /> <br />o Check condition and operation of motor thennal protectors control system (if so equipped). <br /> <br />o Removal of Flygt pump from lift station for physical inspection. <br /> <br />o Check condition of upper shaft seals (inspect condition of motor housing). <br /> <br />o Check condition and operation of leakage detector (if so equipped). <br /> <br />o Check lower shaft seals (inspect condition of oil). <br /> <br />o Change oil if needed (cost of oil included). <br /> <br />o Check for worn or loose impeller. <br /> <br />o Check all impeller wear rings. (Note: Wear rings are not covered by wlUTanty and must be purchased by <br />customer if in need of replacement) <br /> <br />o Check for noise upper and lower bearings. <br /> <br />[J Check physically for damage of pump and power cable. <br /> <br />[J Clean, reset, and check operation of level sensors. <br /> <br />o Check for correct shaft rotation. <br /> <br />[J Reinstall Flygt pump and check for leakage at the discharge connection. <br /> <br />[J Test of pump operation cycle (if level ofliquid in station permits). <br /> <br />[J Check operating of valves and pipes in station. <br /> <br />p~ <br /> <br />6.1E <br />Page 5 <br />