My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-10-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-10-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:40:09 PM
Creation date
10/9/2003 3:26:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
10/13/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� � - 2 <br /> parking garage, which could be a year after work is completed. Adequate <br /> money will be held in retention to insure that all work gets completed (Section <br /> 3.H.3.). <br /> ➢ Removed language relating to strikes, lockouts, and _�ther labor disputes wit; �in <br /> the schedule (Section B.C.). - <br /> ➢ Changed the requirement for Builder's Risk Insurance from the Developer to <br /> the General Contractor, who is able to get this type of insurance. The <br /> deductible amount is also changed to conform to industry standards (Section <br /> 13. B.7.). <br /> Preliminary soil and groundwater testing has been performed on portions of the site, but <br /> not to the extent necessary to start excavation. The Developer has hired a company to <br /> do this testing, and the results will be available the week of October 13, 2003. We are <br /> not anticipating any unusual contamination on the site, but if something should turn up, <br /> we will be back to the Council/Agency for appropriate action. The costs associated <br /> with soil and groundwater clean-up will be paid by the City. <br /> The current cost estimate does not include the "supergraphics" that have been <br /> discussed at some of the meetings. There is adequate time to get designs and cost <br /> estimates prior to completion of the garage. As we get further along in the project, we <br /> will have a better understanding of all construction costs and can look into upgrades, if <br /> warranted. <br /> Because this project is on such a tight schedule, we do not have final plans or hard <br /> bids on many of the trades. Some of the bids received so far are nearly the same as <br /> the estimates from the General Contractor, which is a good sign. <br /> Alternatives <br /> Leave the Agreement in the form approved on September 22, 2003, which could cause <br /> substantial delays. The new language provides City staff clearer direction for <br /> administering the contract. These changes do not cause a delay or increase cost or <br /> City risk for the parking garage. <br /> Fiscal Impacts <br /> These changes to the Agreement do not add any cost to the parking garage, but should <br /> clarify who is responsible for unforeseen costs. <br /> , �� <br /> i. ' � <br /> �J.oeVPatterson Susan Moeller Ed Everett <br /> /�IVlanager, Engineering & Construction Redevelopment Manager City Manager <br /> C% <br /> JP: ss <br /> sAibraryi�oeUcouncil repons/Unde�ground Parking Garage_RemibursementAgreement <br /> Attachment - Redlined version of the revised Agreement <br /> -2- <br />