My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-10-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-10-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:40:09 PM
Creation date
10/9/2003 3:26:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
10/13/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. I-G14 <br /> Exhibit A <br /> Roles and Responsibilities of the Parties <br /> 1. Proiect Renovation — Sco�e of Work <br /> a. The Proje: t scope consists of design, repair and renovation of the existing Pla�eld <br /> at the Fair Ciaks Elementary School 2950 Fair Oaks Avenue, Unincorporated <br /> Redwood Cir� ("Property'). The work will primarily involve activities associated with <br /> improving the field drainage system and installing synthetic turF. The Project is • <br /> estimated to cost a total cost $1.214 million, including architectural services and an <br /> allowance for project contingencies. Funds provided under this Agreement are from <br /> the City, District and County as shown below: <br /> City of Redwood City Redwood City School County of San Mateo <br /> District TOTAL <br /> General Funds School Bond Proceeds Community <br /> Development Block <br /> Grant (CDBG) <br /> $625,000 $289,000 $300,000 $1,214,000 <br /> b. The City shall act as construction manager for the Project, and as such shall take <br /> lead responsibilities for securing Project consultants, including the architect and <br /> engineers, administering the bidding process, negotiating with the successful <br /> construction contractor, monitoring the construction process on behalf of the parties <br /> to this Agreement, and undertake any other activities as may be necessary to <br /> complete the Project. <br /> c. Should the bids come in higher than the estimates totaling $1.214 million for overall <br /> Project costs, the City shall be responsible for securing any additional funding. <br /> Conversely, should the bids come in lower than the estimate set forth above, the <br /> City will then reduce its dollar commitment to reflect the decreased costs. <br /> d. It is acknowledged that on or about August 11, 2003, the City Council shall review <br /> and approve a contract with a landscape architect to establish a construction bid <br /> package and to assist the City in implementing the bidding process. <br /> e. The City will bear 100% of the costs associated with architectural and engineering <br /> fees, estimated at $128,900. These costs shall be part of the Project costs, and the <br /> City shal� be reimbursed for costs incurred and/or to be incurred in connection <br /> therewith. <br /> f. The construction plans, as appropriate, shall be prepared at the City's direction and <br /> provided to the District and County for their approval, which approval shall not be <br /> unreasonabty withheld and or delayed. <br /> g. The Pla�eld shall meet all regulatory requirements applicable to such a facility. <br /> h. The City shall be responsible for the costs, if any, incurred or to be incurred in <br /> connection with the preparation of any environmental study or report under the <br /> California Environmental Quality Act CEQA). <br /> Page 12 of 25 <br /> 10/1 /20031:57 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.