Laserfiche WebLink
<br />DES <br /> <br />ARCH !TECTS <br />E~GINEERS <br /> <br />~ /E-/;7' <br /> <br />SCHEDULE OF CHARGES <br /> <br />. <br /> <br />Services performed on a time-and-expense basis will be charged in accordance with the following <br />schedule of charges. <br /> <br />Personnel Charges (Time): <br />Project Executive <br />Project Manager <br />Project Designer <br />Project Engineer <br />Project Architect <br />Designer/Engineer /Job Captain <br />Detailer/Drafter <br />Project Administrator <br /> <br />Hourly Billing Rate <br />$150-$1-75 <br />$125-$150 <br />$115-$150 <br />$115-$135 <br />$105-$150 <br />$85-$115 <br />$80-$95 <br />$85 <br /> <br />Individual billing rates are based on actual salaries. however they are in the above range for various <br />employee classifications. Personnel charges are for technical wori< including technical typing and time <br />for compiling and printing reports and drawings. Direct charges are not made for office management <br />and/or accounting. If authorized in advance by the Client, Client will be charged expenses for overtime <br />work requiring higher than regular rates. <br /> <br />Expenses: <br />Faxes, per page <br />In-house courier service, per delivery <br />Travel mileage, charges per mile <br />In-house printing and reproduction, per sheet <br />Copies, prints, plots (8 Yz x 11,8 Yz x 14) <br />Copies, prints, plots (11 x 17) <br />Copies, prints, plots (less than 24 x 36) <br />Copies, prints, plots (24 x 36 and larger) <br />Color prints, plots (8 Yz x 11, 8 Yz x 14) <br />Color prints, plots (11 x 17) <br />Color prints, plots (less than 24 x 36) <br />Color prints, plots (24 x 36 and larger) <br />Additional charge for mounting prints <br /> <br />$1.00 <br />$25.00 <br />$0.42 <br /> <br />$0.20 <br />$0.50 <br />$5.00 <br />$10.00 <br />$5.00 <br />$10.00 <br />$40.00 <br />$75.00 <br />$3500 <br /> <br />Charges for all non-in-house consultants and expenses incurred on behalf of the project are computed <br />on the basis of cost plus 20%. <br /> <br />T_rates and charges shown above are reviewed annually in January. Unless other arrangements <br />have been made, charges to all projects, including those continuing from the previous year, will be <br />based on the latest schedule of charges. <br /> <br />Effective 2004 <br />