Laserfiche WebLink
<br />S. /F- /6 <br /> <br />AJllnclusive <br /> <br /> <br />Included <br /> <br /> <br />Included <br /> <br />7. Disposal of Replaced Toilet Fixtures <br />The net cost of removing the replaced fixtures from the customer premises and <br />recycling/disposing. r <br />Filter Recycling f" Included <br /> <br />8. Showerheads <br />Cit will urchase and rovide showerheads. Installation done b <br />Niagara Earth Massage Showerhead, N2920, 2.0- <br />m, white <br />Niagara Earth Massage Showerhead, N2920CH, <br />2.0- m, chrome <br /> <br />contractor. <br />Labor Included <br /> <br />Labor Included <br /> <br />9. Showerhead Adapters <br />Adapters will be required for some showerhead replacements. Installation done by <br />contractor. <br /> <br />I N3170 fits Gerber Included <br />I N3171 fits American Standard Included <br />I N3172 fits Price Pfister Included <br />.. <br /> <br />10. Faucet Aerators <br />Cit will urchase and rovide showerheads. Installation done b <br />Niagara Faucet Sink Aerator, N3104T, 1.5-gpm, <br />Dual Thread <br />Niagara Dual-Setting Touch Flow Kitchen Aerator <br />,withSwivel,N3115V, 1.5- m <br /> <br />contractor. <br />Labor Included <br /> <br />Labor Included <br /> <br />.- <br /> <br />Agreement over $10K <br />City Attorney Approved Version 111803 <br />