<br />~ /6-.<5 <br /> <br />A bid opening was held on Wednesday, September 7, 2005. Four (4) bids were <br />received for the 2004-2005 Slurry Seal Project, and are summarized below: <br /> <br />Rank <br /> <br />Contractor <br /> <br />Amount <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br /> <br />$439,356.00 <br />$468,807.70 <br />$477,049.39 <br />$525,384.22 <br />$472,928.55 <br /> <br />The average bid of $472,928.55 is 72% over the Engineer's Estimate of $275,000 for the <br />cost of construction, and the low bid of $439,356 is 60% over the Engineer's Estimate. <br /> <br />The bids for this years' Slurry Seal Project are higher than the engineering estimate, <br />and substantially higher than last years' bid prices, for several reasons, but mainly <br />because of the increase in material costs. This year there was a large (57%) increase <br />in the cost of the slurry seal emulsion over last year. There was also a significant <br />(51 %) increase in the cost for the application of the slurry seal, which we believe is <br />related to the fact that this project was to be done late in the year, when several <br />contractors are already "booked" for the remainder of the season. Additionally, there <br />was a substantial increase in cost over last year for the removal and replacement of the <br />roadway striping. <br /> <br />Alternative <br />Approve the contract document and award the contract for the 2004-2005 Slurry Seal <br />Project to the lowest responsible bidder, California Pavement Maintenance Co., Inc. of <br />Sacramento, CA, for their low bid of $439,356.10. . <br /> <br />Fiscal Impacts <br />Funds in the amount of $900,000 are appropriated in the 2004-2005 Capital Improvement <br />Program budget as part of the Transportation (Measure "A") Fund. <br /> <br /> <br />A~ ~jV~ ~~ <br />M. Saber Sarwary, P.E. Chu Chang, P.E. <br />Senior Civil Eng i neer Manager, :~:tstruction <br /> <br /> <br />Ed Everett <br />City Manager <br /> <br /> <br />MSS/PD:ss <br />S/library/reportslsaber/rejection_2004-2005 Sluny Seal <br /> <br />Page 2 of 2 <br />