My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-10-03
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2005 10:33:29 AM
Creation date
9/29/2005 1:45:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
10/3/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~£.4-/ <br /> <br />REPORT <br /> <br />To the Honorable Mayor and City Council <br />From the Ci Mana er <br /> <br />October 3,2005 <br /> <br />Subject <br />Final Acceptance - 2004-2005 Sewer Main Replacement Project <br /> <br />Recommendation <br />Accept the 2004-2005 Sewer Main Replacement Project, and authorize the release of <br />bonds and retention, <br /> <br />Background <br />As part of the annual Collection System Replacement Program, areas that have a <br />history of service disruption due to poor pipe conditions, excessive or difficult <br />maintenance requirements, and/or capacity limitations, are improved. <br /> <br />This year's improvements include the rehabilitation of 30 manholes, 3,377 linear feet of <br />sewer main on EI Camino Real using the trench less lining method, and 4,205 linear feet <br />of sewer main on Quartz, Ruby, Sapphire, and Topaz Streets, from Jefferson Avenue to <br />St. Francis Street, using the open-excavation method. <br /> <br />Due to traffic constraints, the trench less method was used for the sewer main on EI <br />Camino Real. The sewer mains on the other streets were deteriorated beyond the lining <br />capability of the trench less method. Therefore, the traditional open-excavation method <br />was used to replace the main. <br /> <br />On March 28, 2005, the City Council awarded the construction contract for the 2004- <br />2005 Sewer Main Replacement Project to McNamara & Smallman Construction Inc. of <br />Livermore, CA, for the amount of $886,172.00. <br /> <br />The project has been successfully completed in accordance with the plans and <br />specifications for a total cost of $818,174.86. Three Change Orders were issued for a <br />credit of $67,997.14. The credit was mainly attributed to a large number of sewer <br />laterals along EI Camino Real that were found to be inactive, and not in need of <br />rehabilitation. <br /> <br />Alternative <br />Do not accept the 2004-2005 Sewer Main Replacement Project, which will leave the <br />project unresolved and delay next year's Sewer Main Replacement Project. <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.