<br />~£.4-/ <br /> <br />REPORT <br /> <br />To the Honorable Mayor and City Council <br />From the Ci Mana er <br /> <br />October 3,2005 <br /> <br />Subject <br />Final Acceptance - 2004-2005 Sewer Main Replacement Project <br /> <br />Recommendation <br />Accept the 2004-2005 Sewer Main Replacement Project, and authorize the release of <br />bonds and retention, <br /> <br />Background <br />As part of the annual Collection System Replacement Program, areas that have a <br />history of service disruption due to poor pipe conditions, excessive or difficult <br />maintenance requirements, and/or capacity limitations, are improved. <br /> <br />This year's improvements include the rehabilitation of 30 manholes, 3,377 linear feet of <br />sewer main on EI Camino Real using the trench less lining method, and 4,205 linear feet <br />of sewer main on Quartz, Ruby, Sapphire, and Topaz Streets, from Jefferson Avenue to <br />St. Francis Street, using the open-excavation method. <br /> <br />Due to traffic constraints, the trench less method was used for the sewer main on EI <br />Camino Real. The sewer mains on the other streets were deteriorated beyond the lining <br />capability of the trench less method. Therefore, the traditional open-excavation method <br />was used to replace the main. <br /> <br />On March 28, 2005, the City Council awarded the construction contract for the 2004- <br />2005 Sewer Main Replacement Project to McNamara & Smallman Construction Inc. of <br />Livermore, CA, for the amount of $886,172.00. <br /> <br />The project has been successfully completed in accordance with the plans and <br />specifications for a total cost of $818,174.86. Three Change Orders were issued for a <br />credit of $67,997.14. The credit was mainly attributed to a large number of sewer <br />laterals along EI Camino Real that were found to be inactive, and not in need of <br />rehabilitation. <br /> <br />Alternative <br />Do not accept the 2004-2005 Sewer Main Replacement Project, which will leave the <br />project unresolved and delay next year's Sewer Main Replacement Project. <br /> <br />Page 1 of 2 <br />