Agmt11 Bay Area Paving, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Bay Area Paving, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2013 11:08:04 AM
Creation date
6/28/2011 2:56:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving, Inc.
PROJECT NAME
2011-2012 Utility Trench repair project
RMP File Number
304
Date
6/27/2011
MO Ref
11-054
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Liquidated Damages <br /> 1. City and Contractor recognize that time is of the essence of this Agreement <br /> and that City will suffer financial loss in the form of lost revenues, contract <br /> administration expenses (including project management and consultants' <br /> expenses), delay and loss of public use, if the Work is not completed within <br /> the time specified in paragraph III.A.1 above plus any extensions thereof <br /> allowed in accordance with the Contract documents. Consistent with Section <br /> 00700 (General Conditions), Contractor and City agree that because of the <br /> nature of the Project, it would be impractical or extremely difficult to fix the <br /> amount of actual damages incurred by City because of a delay in completion <br /> of the Work. <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City $500 for <br /> each Day that expires after the time specified in Paragraph III.A.1 of this <br /> Section 00520 for Contractor to achieve Substantial Completion, until such <br /> date as contractor achieves Substantial Completion. <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br /> suffered by City as a result of delay referenced above. Liquidated damages shall <br /> not cover the cost of completion of the Work, damages resulting from defective <br /> work, cost of temporary replacement facilities, damages suffered by others who <br /> then seek to recover their damages from City (for example, delay claims of other <br /> contractors or subcontractors), and defense costs thereof. <br /> D. Contract Period and Price Adjustments <br /> The contract shall cover a one (1) year period from approximately JUNE 1, 2011 <br /> through JUNE 1, 2012. This contract may be extended by the City for up to two <br /> (2) consecutive years at the discretion and approval of the City. The City shall <br /> notify the Contractor in writing of the intent to extend the contract by June 1 of <br /> the current contract year. The price may be increased up to 5% from the <br /> preceding year based on approval by the City. The City in its discretion may <br /> base increases in the contract price on relevant fluctuations in the Construction <br /> Cost Index for the San Francisco Bay Area in the Engineering News Record. <br /> E. The Contractor shall prepare all bonds and insurance documents in a timely <br /> manner to facilitate the contract extension. <br /> IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood the <br /> nature and extent of the Work, Site, locality, actual conditions, as built conditions, <br /> and all local conditions and federal, state and local laws and regulations that in any <br /> manner may affect cost, progress, performance or furnishing of Work or which <br /> relate to any aspect of the design and the means, methods, techniques, sequences <br /> or procedures of construction to be employed by Contractor and safety precautions <br />