My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res03 14549
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2003
>
Res03 14549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2011 1:25:12 PM
Creation date
9/18/2003 11:36:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
8/25/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
during trash compaction and collections could potentially impact off -site <br />receptors. (Potentially Significant) <br />Mitigation: The following mitigation measure, as set forth in the <br />FEIR, is hereby adopted and will be implemented as provided in the Mitigation <br />Monitoring Program: <br />• Mitigation Measure NO -3.1 <br />Finding: Mitigation Measure NO -3.1 is feasible and would reduce <br />the potentially significant environmental impact described above to a less -than- <br />significant level. <br />The mitigation measure identified above would reduce the <br />potentially significant environmental impact described above to a less -than- <br />significant level by ensuring that loading docks, trash compaction, and storage <br />facilities and compressors associated with new buildings on the Project site are <br />located so that the building itself serves as a noise buffer or, alternatively, so that <br />adequate noise buffers are constructed. <br />The potential impact of the Project as contemplated in the Higher <br />Occupancy Scenario would be similar to the potential impact of the Project as <br />proposed, because the loading docks and during trash compaction and <br />collections of the Project as contemplated in the Higher Occupancy Scenario <br />would be similar to the loading docks and during trash compaction and <br />collections of the Project as proposed. Likewise, the mitigation measure would <br />be similarly effective with respect to the Project as proposed and the Project as <br />contemplated in the Higher Occupancy Scenario. <br />VI. HAZARDOUS MATERIALS <br />A. Construction - Related Hazardous Materials Disturbance <br />Potential Impact: Under the proposed Project and the Higher <br />Occupancy Scenario, project - related demolition or renovation could disturb <br />hazardous materials in existing building components and thereby cause adverse <br />health or safety effects. (Potentially Significant) <br />Mitigation: The following mitigation measure, as set forth in the <br />FEIR, is hereby adopted and will be implemented as provided in the Mitigation <br />Monitoring Program: <br />Mitigation Measure HM -1.1 <br />Finding: Mitigation Measure HM -1.1 is feasible and would reduce <br />the potentially significant environmental impact described above to a less -than- <br />significant level. <br />
The URL can be used to link to this page
Your browser does not support the video tag.