Laserfiche WebLink
Exhibit A <br />2011 -2012 TPSRP PRICES <br />Item <br />EST. <br />SPENCON <br />SPENCON <br />Unit Price + <br />1.33% <br />Item Cost <br />Unit Price + <br />3.19% <br />Item Cost <br />No. <br />Qty. <br />Unit <br />Description of Item <br />Unit Price <br />(2009 Bid Price) <br />Item Cost <br />Prices for <br />Amend. 1 <br />Prices for <br />Amend. 2 <br />1 <br />28,500 <br />SF <br />Remove existing sidewalk <br />$1.00 <br />$28,500.00 <br />$1.01 <br />$28,879.05 <br />$1.05 <br />$29,800.29 <br />2 <br />27,500 <br />SF <br />Construct concrete sidewalk <br />$6.76 <br />$185,900.00 <br />$6.85 <br />$188,372.47 <br />$7.07 <br />$194,381.55 <br />3 <br />1,00o <br />SF <br />Remove existing sidewalk for <br />installation of rubber sidewalk <br />$1.00 <br />$1,000.00 <br />$1.01 <br />$1,013.30 <br />$1.05 <br />$1,045.62 <br />4 <br />6,000 <br />SF <br />Remove existing driveway <br />$1.00 <br />$6,000.00 <br />$1.01 <br />$6,079.80 <br />$1.05 <br />$6,273.75 <br />5 <br />6,000 <br />SF <br />Construct concrete driveway <br />$7.60 <br />$45,600.00 <br />$7.70 <br />$46,206.48 <br />$7.95 <br />$47,680.47 <br />6 <br />5,600 <br />LF <br />Remove existing curb and gutter <br />$3.00 <br />$16,800.00 <br />$3.04 <br />$17,023.44 <br />$3.14 <br />$17,566.49 <br />7 <br />5,600 <br />LF <br />Construct concrete curb and <br />gutter <br />$25.00 <br />$140,000.00 <br />$25.33 <br />$141,862.00 <br />$26.14 <br />$146,387.40 <br />8 <br />500 <br />SF <br />Remove walkway material <br />$1.00 <br />$500.00 <br />$1.01 <br />$506.65 <br />$1.05 <br />$522.81 <br />9 <br />47 <br />EA <br />Construct wheel chair ramp (Std. <br />Detail C -9 Case C) <br />$1,080.00 <br />$50,760.00 <br />$1,094.36 <br />$51,435.11 <br />$1,129.27 <br />$53,075.89 <br />10 <br />5,000 <br />SF <br />Remove and replace asphalt <br />$5.00 <br />$25,000.00 <br />$5.07 <br />$25,332.50 <br />$5.23 <br />$26,140.61 <br />11 <br />100 <br />LF <br />Repair irrigation system <br />$5.00 <br />$500.00 <br />$5.07 <br />$506.65 <br />$5.23 <br />$522.81 <br />12 <br />10 <br />CY <br />Additional sub -base excavation <br />$40.00 <br />$400.00 <br />$40.53 <br />$405.32 <br />$41.82 <br />$418.25 <br />13 <br />15 <br />LF <br />Drain Line Installation <br />$65.00 <br />$975.00 <br />$65.86 <br />$987.97 <br />$67.97 <br />$1,019.48 <br />Total base bid item 1 through <br />13 <br />$501,935.00 <br />$508,610.74 <br />$524,835.42 <br />S abed - '0 6,9 <br />