My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
iti0 -Zq <br />With a copy to: Patricia J. Webb, Economic Development Coordinator <br />Redwood City Redevelopment Agency <br />1017 MidOefield Road <br />Redwood City, CA 94063 <br />Telephone: (650) 780 -7365 <br />Facsimile: (650) 780 -7039 <br />The Agency, City and Developer may designate, by <br />different addresses to which subsequent notices, cer <br />shall be sent. <br />16. No Third Partv Beneficiaries. AO <br />No person or entity shall be deemecMe a <br />nothing in this Agreement (either express orl <br />person or entity, other than the Cit y,4h-e Agency <br />successors and assigns) any right n <br />reason of this Agreement. <br />17. Force Maieure. <br />Neither Developer nor Crtt-nor Ac <br />writing, any further or <br />communications <br />and <br />to confer upon any <br />Developer (and their respective <br />Jis or liabilities under or by <br />shall be in default of any provision of this <br />Agreement where - timely perfo or timeVcompliance is prevented by Acts of God, <br />including natural disa anusu nily severe inclement weather, civil <br />emergencies, including wit limitation, acts of terrorism, inability to obtain materials <br />(except for such in oac.Wjoned by the act or failure to act of Developer, its <br />Consultants or Contract, the - Unanticipated presence of hazardous substances or <br />other concealed condition the Project Site that materially change the time or cost of <br />performing theServices_�ajDd that Developer, its Consultants and Contractors could not <br />have identified in = e of performing a thorough and prudent investigation of the <br />Project Site, change governmental regulations or similar events which are beyond <br />that party's reasonable ability to control; however, the affected party shall be obligated <br />to perform or comply within a reasonable time after the event or action which precluded <br />such party from timely performance no longer exists. <br />
The URL can be used to link to this page
Your browser does not support the video tag.