My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Pacific Shores Dev
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Pacific Shores Dev
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 12:24:13 PM
Creation date
9/18/2003 4:18:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Shores Development
PROJECT NAME
storm drainage and Seaport Blvd construction improvements
RMP File Number
304
Date
7/21/2000
Reso Ref
13918, 13937
MO Ref
00-261, 00-262, 02-240
Box
5941
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
intention to cancel'or materially to change the terms of ~id policies given to City. If <br />such insurance covers Owner, other entity, or person(s) in addition to the City of <br />Redwood City, such policy shall contain the standard form of cross liability or <br />severability of interest endorsement. Such insurance shall also specifically insure any <br />contractual liability assumed by Owner under the terms of this Agreement, including, but <br />not limited to, the provisions of paragraph 1 above. <br /> <br /> $. Ownership of Improvements. It is agreed that title and ownership of all <br />Improvements constructed for the benefit of City hereunder by Owner shall vest <br />absolutely in City upon completion and acceptance of such Improvements by City. <br /> <br /> 6. Work Subject to Approval. All work provided for in this Agreement and <br />more specifically described in the plans and specifications herein referenced shall be <br />subject to the approval and acceptance by the Manager, Engineering and Construction <br />before the release of any security required herein. Reference is hereby made to (a) <br />those certain revised specifications entitled, "Engineering Standards of the City of <br />Redwood City", adopted January 5, 1998, and (b) those certain plans on file in the office <br />of the Manager, Engineering and Construction entitled, "Improvement Plans for Seaport <br />Boulevard," and in accordance with and as provided for in those certain specifications <br />entitled, "Supplemental Specifications for Civil/Landscape/Irrigation Improvements," for a <br />more particular description of the work and Improvements generally described in this <br />Agreement. Said plans and specifications referenced in this paragraph are hereby <br />incorporated herein and made a part of this Agreement. Upon completion of the <br />aforementioned work, and prior to the release of any security required herein, Owner <br />shall furnish City with a complete set of plans and drawings showing the Improvements <br />in their actual or "as built" condition and location. <br /> <br />Agrnt-361 ~qG Page: 6 of 17 <br />06/05100 <br />06/09/00R <br />FXS~s <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.