My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Metcalf & Eddy
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Metcalf & Eddy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:56:58 PM
Creation date
10/2/2003 2:47:06 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Metcalf & Eddy
PROJECT NAME
Redwood Shores sewer pump station #2
RMP File Number
304
Date
1/27/1997
Reso Ref
12981
Box
5862
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "B" <br /> Metca f & Eddy - <br /> An Air& Water Techno~i~SlClOl~.?~ AmES <br /> (January 1996) <br /> Hourly <br />LABOR Rate <br /> <br /> CONSULTING / ENGINEERING <br /> Proj Dir / Principal / Sr Tach Dir (Gr E09-E10) ........................................... 161 <br /> Sr Proj Mgr / Sr Tech Spec II (Crt EOB) ................................................ 136 <br /> Proj Mgr / Sr Proj Sci li or Eng Ii / Sr Tach Spec 1 / Sr Proj Des Eng II (Gr EOT) .................... 110 <br /> Sr Proj Sci I or Sr Proj Eng I / Tach Spec 1I / $r Proj Des Eng I (Gr EO6) ........................... 91 <br /> Proj Sci 1I or Proj Eng II / Tech Spec I / Sr Des Eng II (Gr EOb') ................................. 85 <br /> Proj Sci I or Proj Eng I / $r Sci 11 or Sr Eng II / Tach Spec I / Sr Des Eng I (Gr EO4) .................. 76 <br /> Sr Sci I or Sr Eng I / Dos Eng II (Gr EO3) ................................................ 65 <br /> Sci II or Eng II / Des Eng I / Spec II (Crt EO2) ............................................. 58 <br /> Sci I or Eng I / Proj Asst / Spec I (Gr EO1) ............................................... 51 <br /> <br /> CONSTRUCTION / FIELD SERVICES <br /> Proj Constr Mgr / Sr Const Spec (Gr EO7) ............................................... 93 <br /> Const Spec II /Fld Proj Mgr II / Res Rep II (Gr EO6) ........................................ 77 <br /> Const Spec I /Fld Proj Mgr I / Res Rep I (Crt EOS) .......................................... 71 <br /> Sr Field Const Svcs Spec / Est'master (Gr EO3-EO4.) ......................................... 61 <br /> Fiald Const Svcs Spec / Inspector (Gr EO1-EO2) ........................................... 46 <br /> Sr Foreman / Sr laborer II (Crt NO4) ................................................... 50 <br /> Foreman II / Sr Laborer I / Sr Operator (Gr NO3) ........................................... 39 <br /> Foreman I / Laborer II / Operator (Gr NO2) ............................................... 31 <br /> Laborer (Gr NO1) ................................................................ 25 <br /> <br /> DESIGN AND DRAFTING <br /> Sr Tech ]III / Sr Designer Il (Gr NOS) ................................................... 81 <br /> Sr Tech II / Sr Designer I (Crt NO4-) .................................................... 59 <br /> $r Tech I / Sr Designer / Sr Drafter (Gr NO3) ............................................. 415 <br /> Tech II / Drafter (Gr NO2) .......................................................... 37 <br /> Eng Aide (Gr NOD ............................................................... 19 <br /> <br /> PROJECT SUPPORT SERVICES <br /> Paralegal / Sr Coordinator / Sr Clerk Il (Gr NO4) ........................................... 59 <br /> $r Sect or Adrnin Assr / Coordinator II / Sr Clerk I (Ch' NO3) ................................... 46 <br /> Secretary / Coordinator / Clerk H (Ch' NO2) ............................................... 37 <br /> Clark I (Gr NOI) ................................................................ 19 <br /> <br />EQUIPMENT EXPENSES <br /> <br /> Mainframe-Based CADD ........................................................... 22 <br /> PC-Based CADD ................................................................ 10 <br /> Personal Computer / Word Processing Equip ............................................... 8 <br /> Field and Health & Safety ................................................. saperato prica list <br /> <br />NONSALARY EXPENSES ................................................. 1.1 Canes cost <br /> <br /> Nonsalary expenses include, but are not limited to, such typical expenses as the cost of transpertafion and subsb~nce; <br /> telephone and telefax use; printing and reproduction; equipment and materials; identifiable supplies; outside consultant <br /> charges; subcontracts for sarvices such as surveys and subsurface investigations; testing by in-house and commercial <br /> laboratories; charges by reviewing authorities; and similar out-of-pocket expenses. <br /> <br />BILLING RATES ARE SUBJECT TO INCREASE DURING THE COURSE OF EACH YEAR. A LATE PA~ <br />CHARGE WILL BE APPLIED TO ANY UNPAID BAI.~uNCE BEGINNING 30 DAYS APTER THE DATE OF THE <br />ORIGINAL INVOICE. <br /> <br /> 1804 Embarcadero Road, Suite 100, Palo Alto, CA 94303-3308 <br /> TEL: 415-494-9300 FAX: 415-494-2434 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.