Laserfiche WebLink
SIGNET Ex. rF "A" ~ <br /> <br /> TESTING AND INSPECTION SERVICES <br /> 1.A.) Redwood Shores Fire Station, Tank/Generator Enclosure <br /> (Excludes Structural Steel) <br /> <br /> t.B.) Pump Station (Masonry Only) <br /> 680 Redwood Shores Parkway, Redwood City, CA <br /> <br /> 2) Maintenance Facility (Pre-Engineered Building) <br /> 1400 Radio Road, Redwood City, CA <br /> <br /> June 27, 1997 <br /> <br />I. REINFORCING STEEL (For Concrete Only) <br /> <br /> Field Placement Inspection <br /> No. days: 1.5 No. hfs: 12 Rate/hr: 43.00 $ 516.00 <br /> <br /> Inspection, Sampling and Tagging (@ fabricator's yard) <br /> No. days: 4 No. hfs: 16 Rate/hr: 43.00 $ 688.00 <br /> <br /> Tensile Test (through #8 size) <br /> No.: 3 Rate/ea: 31.00 $ 93.00 <br /> <br /> Bend Test (through #1 ~ size) <br /> No.: 3 Rate/ea: 18.50 $ 55.50 <br /> <br />II. CONCRETE - Cast-in-Place <br /> <br /> Mix Design Reviews (Please allow 3 days lead time for review) <br /> No.: 2 Rate/ea: 99.00 $ 198.00 <br /> <br /> Concrete/Reinforcing Placement Inspection <br /> No. days: 5 No. hfs: 40 Rate/hr: 43.00 $ 1,720.00 <br /> <br /> Cylinder Compression Tests <br /> No.: 18 Rate/ea: 18.50 $ 333.00 <br /> <br /> Continuous Batch Plant Inspection -- N/A $ ~ - - <br /> <br /> Drying Shrinkage Tests, if required as per Spec. Section 03300 <br /> No.: 6 Rate/ea: 99.00 $ - - - <br /> <br /> Pick Up of Samples <br /> No. trips: 5 Rate/m: 34.00 $ 170.00 <br /> <br /> page I of 3 <br /> <br /> <br />