My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Signet Testing Labs
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Signet Testing Labs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:57:04 PM
Creation date
10/3/2003 10:17:39 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Signet Testing Labs
PROJECT NAME
construction and inspection services
RMP File Number
304
Date
9/22/1997
Box
5862
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SIGNET <br /> EXHIBIT "B" <br /> <br /> TESTING AND INSPECTION SERVICES <br /> 1.A.) Redwood Shores Fire Station, Tank/Generator Enclosure <br /> (Excludes Structural Steel) <br /> <br /> I.B.) Pump Station (Masonry Only) <br /> 680 Redwood Shores Parkway, Redwood City, CA <br /> <br /> 2) Maintenance Facility (Pre-Engineered Building) <br /> 1400 Radio Road, Redwood City, CA <br /> <br /> June 27, 1997 <br /> <br />Basis of Char~,es <br /> <br />Signet's services are provided on a time and materials basis. <br /> <br />All terms, conditions and services not described within this proposal but otherwise required during <br />the course of this project will be in accordance with our 1996-97 Fee Schedule. <br /> <br />The proposed unit rates will be in effect through February 28, 1998. Thereafter, the unit rates are <br />subject to an increase of 5 1/2 percent per year to mitigate the annual operating cost increases. <br /> <br />Show-up Time (min. 2 hr. increments) Bill 2 hours <br />Work 0 - 4 hours Bill 4 hours <br />Work 4 - 8 hours Bill 8 hours <br />Swing/Night Shift $5/hr Additional <br />Over 8 hours & Saturdays 1.5 x Basic Rate <br />Sundays/Holidays & Over 8 hours on Saturday 2 x Basic Rate <br /> <br />Disuatch/Miscellaneous <br /> <br />We request 24 hours advance notice (minimum) when dispatching. Contractor to provide safe <br />access to all actual inspection/testing locations (via suitable ladders, etc.). Verification of <br />building's plumbness/levelness by others. All charges are portal to portal. <br /> <br />Final Affidavit <br /> <br />The final inspection report (affidavit) will be issued on the 6th working day following the request <br />for the affidavit by the project representative. At the time of this transaction, all outstanding issues <br />of inspection, testing and accounting (fees) shall have been cleared to our satisfaction prior to <br />release of the affidavit. Outstanding issues include, but are not limited to, the approved resolutions <br />to NCR' s, RFI' s, tardy submittals, 28-day concrete test results and/or payment for services. <br /> <br />Payment Schedule <br /> <br /> Net 30 days. A 1-1/2% per month late payment charge will be levied on invoice payments <br /> received after 30 days of invoice date. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.