Laserfiche WebLink
EXHIBIT "B" <br /> SMITH-EMERY GEOSERVICES <br /> <br /> August 25, 1997 <br /> Proposal No.: SF 97-090 <br /> <br />COST BREAKDOWN FOR 1996-1997 WATERMAIN REPLACEMENT <br /> <br />A. Ae~re~ate Base/Subbase/Bedding Insl~ection-Soils Technician <br /> <br />Agg. Base Insp. 24 days ~ 8 hrs./day ~ $42.00 hr. $ 8,064.00 <br />Agg. Subbase Insp. 20 days ~ 8 hrs./day ~ $42.00 hr. $ 6,720.00 <br />Bedding Insp. 14 days ~ 8 hrs./day ~ $42.00 hr. $ 4,704.00 <br />Misc. Earthwork Insp. 8 days ~ 4 hrs./day ~ $42.00 hr. $ 1,344.00 <br />Pick-Up/Delivery $35.00 as needed <br />*Nuclear Density/Sand Cone Testing No Additional Per-test Charge <br />*Field Vehicles No Additional Per-test Charge <br /> <br /> Subtotal $ 20,832.00 <br />B. Geotechnical Laboratory Testing-Laboratory Technician <br /> <br />Aggregate Base and Subbase Materials <br />Percent Crashed Particle % CAL 205 1 ~ $ 50.00 ea. $ 50.00 <br />Sieve Analysis of Base ASTM C-136 6 ~ $ 50.00 ea. $ 300.00 <br />Durability Index CAL. 229 1 ~ $ 90.00 ea. $ 90.00 <br />Resistance Value(R-Value) CAL 301 2 ~ $150.00 ea. $ 300.00 <br />Sand Equivalent CAL.217 4 ~ $ 65.00 ea. $ 260.00 <br />Moisture Density of Soils ASTM D1557 10 ~ $110.00 ea. $ 1,100.00 <br />Percent Moisture ASTM D2216 No Charge <br />In-Place Density CAL 375 No Charge <br /> <br /> Subtotal $ 2,100.00 <br />C. Engineering and Final Report of Compacted Material <br /> <br />Project Engineer 20 hrs. ~ $ 65.00 hr. $ 1,300.00 <br />Report of Compacted Material Lump Sum $ 350.00 <br /> <br /> Subtotal $ 1,650.00 <br /> ESTIMATED TOTAL $ 24,582.00 <br /> <br /> 11 <br /> <br /> <br />