My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Smith Emery Geoservices
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Smith Emery Geoservices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:57:06 PM
Creation date
10/3/2003 11:17:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Smith Emery Geoservices
PROJECT NAME
1996-97 watermain replacement
RMP File Number
304
Date
11/6/1997
Reso Ref
13200
Box
5862
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "B" <br /> SMITH-EMERY GEOSERVICES <br /> <br /> August 25, 1997 <br /> Proposal No.: SF 97-090 <br /> <br />COST BREAKDOWN FOR 1996-1997 WATERMAIN REPLACEMENT <br /> <br />A. Ae~re~ate Base/Subbase/Bedding Insl~ection-Soils Technician <br /> <br />Agg. Base Insp. 24 days ~ 8 hrs./day ~ $42.00 hr. $ 8,064.00 <br />Agg. Subbase Insp. 20 days ~ 8 hrs./day ~ $42.00 hr. $ 6,720.00 <br />Bedding Insp. 14 days ~ 8 hrs./day ~ $42.00 hr. $ 4,704.00 <br />Misc. Earthwork Insp. 8 days ~ 4 hrs./day ~ $42.00 hr. $ 1,344.00 <br />Pick-Up/Delivery $35.00 as needed <br />*Nuclear Density/Sand Cone Testing No Additional Per-test Charge <br />*Field Vehicles No Additional Per-test Charge <br /> <br /> Subtotal $ 20,832.00 <br />B. Geotechnical Laboratory Testing-Laboratory Technician <br /> <br />Aggregate Base and Subbase Materials <br />Percent Crashed Particle % CAL 205 1 ~ $ 50.00 ea. $ 50.00 <br />Sieve Analysis of Base ASTM C-136 6 ~ $ 50.00 ea. $ 300.00 <br />Durability Index CAL. 229 1 ~ $ 90.00 ea. $ 90.00 <br />Resistance Value(R-Value) CAL 301 2 ~ $150.00 ea. $ 300.00 <br />Sand Equivalent CAL.217 4 ~ $ 65.00 ea. $ 260.00 <br />Moisture Density of Soils ASTM D1557 10 ~ $110.00 ea. $ 1,100.00 <br />Percent Moisture ASTM D2216 No Charge <br />In-Place Density CAL 375 No Charge <br /> <br /> Subtotal $ 2,100.00 <br />C. Engineering and Final Report of Compacted Material <br /> <br />Project Engineer 20 hrs. ~ $ 65.00 hr. $ 1,300.00 <br />Report of Compacted Material Lump Sum $ 350.00 <br /> <br /> Subtotal $ 1,650.00 <br /> ESTIMATED TOTAL $ 24,582.00 <br /> <br /> 11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.