My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Edcco Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Edcco Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2011 1:41:06 PM
Creation date
8/2/2011 1:41:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Edcco Group, Inc.
PROJECT NAME
Glenwood Pump Station Engineering and controls for Rehabilitation Project, Q1110628001
RMP File Number
304.5
Date
7/29/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br /> The EDCCO Group, lnc 9b Glann Way SuXa 100 Phane (650) 64-8887 <br /> �,,,�,,,,,,.;,,„�� •(��.d� SBnCBrlaa Cal(f 90070 FAX (850)eq&2326 <br /> •-��ar•^=��c' emai mfo�EOCW Cwn <br /> Mr Phong Du <br /> The City of Redwood City <br /> Engineenng and Constructwn <br /> 1017 Middlefield Road <br /> Redwood City, CA 94063 VIA email lune 28, 2011 <br /> SUBJECT: Glenwood Pump Sta4ion 47 11 062800 7 <br /> Engineer7ng and Controis for Rehabilitation Project Revision 0 <br /> Phong, <br /> This quotation combmes our proposals for <br /> 1 Construction support, and temporary pumping controls for the Glenwood Pump Station <br /> 2 Furnish PLC, HMI, and PLC/SCADA programming, start-up, for the Glenwood Pump <br /> Station Pro�ect <br /> SCHEDULE OF TASKS AND DELIVERABLES <br /> Schedules "A" is attached <br /> PROPOSED PROJECT <br /> • Rehabdiiation of Glenwood Pump Station to add VFD pumps and associated <br /> equipment, instrumentation, and programming as follows <br /> • Review design drawings and vendor submittals <br /> • Relocate existing SCADA controls and interface with city-owned engine pump <br /> and control valve for temporary operahons during construction <br /> • Des�gn and furmsh a SCADA PLC panel for contractor installation <br /> � Support the start-up team with start-up of new eqwpment <br /> • Provide programmmg of new PLC and existing SCADA system <br /> • Participate in pump station testing and acceptance actiwties <br /> ESTABLISH PROJECT MANAGEMENT METHODS <br /> � This pro�ect wdl be coordinated through Redwood City's Engmeenng and Construction <br /> Division, Public Works Operations, Construction Management, and RMC Engineers <br /> o We wdl respond directly to requests from parties and cc/not�fy other parties as <br /> appropnate for the situation (based upon experience with the existmg pro�ect) <br /> REVIEW DESIGN DOCUMENTS <br /> • RMC Engineers <br /> • Current as-budt documentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.