Laserfiche WebLink
ATTACHMENT 6(b) <br /> Brian Kangas Fouik <br /> Engineers . Surveyors . Planners ' <br /> Description of IAC Shared Infrash•ucture <br /> lrvine Anarlment Commtinrties Phase — Stand Alone <br /> l. Maple Street <br /> • Reconstruct Maple Street between EI Camino Real and the Joint Po�vers Board's <br /> CalTrain right-of-way. <br /> • Realign Maple Street at its intersection �vid� El Camino ReaL <br /> • Close and barricade Latl�rop Street at the intersection with Maple Street. <br /> • Provide a dedicated right and left turn lane on Maple Street at the El Camino intersection <br /> and provide a dedicated feft turn lane from Maple Street onto Pranklin Street. <br /> IL Franklin Street <br /> • Relocate Pranklin Strcet bet�vicen Maple Street and Monroe Street. <br /> • Pro��ide interim transitioi� ro the esisting road�vay beyond the Monroe Street intcrsection. <br /> • Provide access to existing Bekins on-grade parking lot from Pranklin Street. <br /> IIL EI Camino Real <br /> • Modify the traffic signal medians and signing and striping at the intersection of EI <br /> Camino and the realigned Maple Street. <br /> • Install frontage itnproventents on EI Camino bet���een Maple Street and tlie e�isting <br /> Bekins building. <br /> • Consvuct new curb cut at the pri��ate street connecting to the Bekins buifding and <br /> Building I A parking garage. <br /> IV. n4onroe Streel <br /> • Reconstruct Monroe Street beriveen Pranklin Street and the CafTrain right of way. <br /> • Provide fire truck turnaround at the end of Monroe Street. <br /> V. Public Undereround Utilities <br /> A. Storm Drainage. <br /> • Install trunk line from the Red���ood Geek outfall near Maple Street to the relocated <br /> rranklin Street. <br /> • Size die fine to anticipate future de��elopment. <br /> 540 Priw Avenue . Aedwoad Ciry, CA 94063 • �650� 482-6300 • FAX �650� 482-6399 <br /> flno nf Fnnr <br />