My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-08-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2012 12:02:59 PM
Creation date
8/18/2011 4:39:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/22/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2. B. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> August 22, 2011 <br /> SUBJECT <br /> Final Acceptance of Work Completed During Amendment One of the Cost Shared <br /> Sidewalk Repair Project and Issuance of Amendment Two for the Cost Shared <br /> Sidewalk Repair Project <br /> RECOMMENDATION <br /> 1. By motion, approve the work completed during Amendment One of the Agreement for <br /> Cost Shared Sidewalk Repair Project by SpenCon Construction, Inc. of Danville, CA. <br /> 2. Authorize the release of the bonds and the Retention withheld during the course of <br /> work in accordance with City procedure <br /> 3. By motion, approve issuance of Amendment Number Two to the Agreement for Cost <br /> Shared Sidewalk Repair Project with SpenCon Construction Inc. of Danville, CA in the <br /> amount of $140,000.00 and authorize the City Manager to increase the contract <br /> amount, if necessary, up to 10% of the amount awarded <br /> BACKGROUND <br /> On July 27, 2009, the City Council awarded the 2009-2010 Cost Shared Sidewalk <br /> Repair contract to SpenCon Construction Inc. of Danville, CA for their bid of <br /> $241,025.00. The original agreement includes the option for four (4) extensions using <br /> relevant fluctuations in the Construction Cost Index for the San Francisco Bay Area as <br /> listed in the Engineering News Record to adjust bid item amounts by a maximum of five <br /> percent. On September 27, 2010 the City Council authorized execution of Amendment <br /> Number 1 to the Agreement in the amount of $244,230.00. The construction of <br /> improvements has been completed in accordance with the Agreement, the plans and <br /> specifications, and to the satisfaction of City staff. Therefore City staff recommends that <br /> Council accept the improvements, release retention in the amount of $25,374.00 and <br /> release the performance bond and labor and material bond according to City <br /> procedures. <br /> The work completed during Amendment One included installation of 12 ADA curb <br /> ramps, replacement of sidewalk, curb and gutter and driveway areas. Work was <br /> performed at approximately 60 residential locations and at 22 commercial locations. <br /> The work to be done during Amendment Number 2 will be of the same nature as the <br /> work done during the term of the initial Agreement and Amendment Number 1. Repairs <br /> will be made to various sidewalks, curbs and gutters throughout the city and ADA curb <br /> ramps will be constructed at street corners when sidewalk work is being performed at <br />
The URL can be used to link to this page
Your browser does not support the video tag.