Laserfiche WebLink
8.A. - Page 64 <br /> Laurel Way 7oint Venture <br /> La.urea Way Area Neighbors Association <br /> April 15, 2011 <br /> Page 3 <br /> City staffhas concluded that sections 322, 33.2, and 46.7, taken toget}�er, thus authorize <br /> development of the existing lots within the Laurel Way Project, but only t�rough the Planned <br /> Development Permit process. <br /> In 198$ and again in 2000, tl�e City Council provided policy direction that, priar to further <br /> development of individual lots in the Laurel Way area, a full environmental impact report should be <br /> prepared which comprehensively analyzes the cumulative development of full buzldaut af these lots. <br /> Ii2 July, 2007, the Laurel Way Joint Venture submitted an application fQr a Plazitied <br /> Development Permit and for a Vesting Tentative Map for the Laurel Way �'roject, which initiated an <br /> env�ronmental review process with the City. The application proposed development of 1$ �omes in <br /> the Project area. The VTM provi�led far merging three of the lots into two Zots, one of whic� would <br /> be left as open space. The remaining 17 lots would remain largely in the saine configuration as they <br /> currently are, but the VTM praposed m�inor adjustments to their respective boundaries tc� <br /> accominodate development of a larger a�cess road. <br /> The City proceeded with preparation of bo�h a Draft and then a proposed Final EIR for this <br /> proposed project, with such preparation fun�.ed by the Laurel Way Join# Venture. The City retained a <br /> planning consulting firm, RMT, Inc., to prepare t�e EIR. The City published the Draft EIR in <br /> February 2010 and then circulated it for public review and cornrnent In Au�ust, 2010, the City <br /> published a propased Final EIR, which ineluded responses to all public coinments reCeived durin� the <br /> cominent period. <br /> Before the Draft EIR was prepared, the Joint Venture retained severa7 engineering firms ta <br /> conduct environmental studies of the patei�tiai cumulative impacts of Project development, including <br /> geologic/geotechnical studies, hydrologic storm draiunage analyses, traf�c s�udie�, and analyses of <br /> l�iological impacts. The City's EIR consultant, RMT, Inc., retained separate engineering consultants <br /> in each of these fields to eonduct independent peer reviews of each of these studies, The Draft EIR <br /> surnmarizes the analyses from all of these studies, which are aIso reproduced in full in Appendix E of <br /> the Draft EIR. <br /> On August 24, 2010, while the development applications were sti�l pending, the City s <br /> Plannin�; Coir�unission ti to certify the Final EIR. LWA1`�1A app�aled that certification to the City <br /> Council. With the concuz of both the Laur�l Way Joint Venture ana LWAI�IA, City staff <br /> defen�ed the scheduling of that appeal foz a hearing before the City Council pending Plannin� <br /> Commission action an the deveIopment applicatians themseIves. <br /> On December 7, 2010, the Planning Commission heId a public hearing to consider the <br /> applications for the Flanned Development Pernut and the Vesting Tentative Map. In its staffreport <br /> for that hearing, City sta#�r•ecom�naended against approval af tne Project as proposed by the ,Toint <br />