Laserfiche WebLink
8.A. - Page 120 <br /> ! 1 !AI IQL� <br /> manatt � phalps J phillips <br /> Honorable Mayor and Members of the City Council <br /> August 15, 2011 <br /> Page 9 <br /> decisiomnalcers with information wl�ich enables them to nnaice a decisio�l vvhrch intellig�ntly <br /> takes accnunt oF environrnei�tal cansequences.,." (San Joaquira Raptar Rescue Ctr. v, County of' <br /> Merced (2007) 149 Ca1.App,4th b45, quoting CEQA Guidelines. § 15151.) The EIR fails to . <br /> comply �uvith these mandatory require�nents. <br /> The praject°s significant impacts are gravely underestimated when compared to the baseline <br /> thresholds. Further�nore, there are a{lditional uiliden#ified significarit advcrse impacts and <br /> curr�ulative impacts overlooked by the EIR. Notwithstandin.g the fact that signif cant adverse <br /> impacts are underestimated or overlooked, the "mitigatian measures" proposed to reduce the <br /> actually-identified impacts woefully inadequate, unrealistic and irnpractical. <br /> Exanaples of the ETR's fa�al deficiencies include the follawing: <br /> o According to Geology aa�d Hydrology reports provided by t�ie City, several <br /> critical measures necessary to evaluate the potentiatly signif�cant environmental <br /> impacts of the praject have not yet been undertaken. These include, but are not <br /> Iimited to, grading and improvement plans, a detailed Erosion Cont�al P�an, a <br /> S#orna Water Pollution Prevention Plan, a Spill Contingency and Countermeasures <br /> Plan, an eva3uation of ax7 existing landslide on Lots 3 and 4, and other c�itical <br /> tasks suah as temporary excavation support plans, detailed fonndation <br /> exploratians and geotechnica] investigations on each loL. (See FE1R, Appenciix <br /> A: MitigaYion Manitoring and Reporting program; Resalution, Exhibit A, pp. 11- <br /> 24) <br /> a Publicly available reports af nearby rnercury mining activity have not heex� <br /> anal.yzed, nor have soil toxicity tests #'ar mercury a�ad attendant pollutants been <br /> per#'ormed. This seems to have besn a particularly cancerning oversight givcn <br /> that at least one mercury nnine was aperat�onal in the area, a decomposing oil <br /> drum was locatec� on site, and there is substantial evidence of se�ps in the same <br /> vicini#.y. <br /> o Many coimn�nts an the DEIR noted serious concern. tl�at proposed grading and <br /> excavation would destabiiize the hiliside and adversely impact adjacent <br /> residences and the existing creek. There is i10 substantial evidence an the recard <br /> $ The list of noted deficiencies is not exhaustive, and is based on a review of tlZe pre�iously submitted {now <br /> withdrawn} project praposal. The evidence presented i�� basad on input from bo� experts, and non-experts, <br /> including the personal observatioz►s and past experience of area residents. The members of I,WANA live and own <br /> property in the �icinity of t]ie project sste, and ha�e direct knowledge of the environmental constraints of the site. <br />