Laserfiche WebLink
8.A. - Page 122♦ <br /> I 1 IA1 IQI�I� <br /> manatl � phelps � phillips <br /> Honorahle Mayor and Members of tlze City Cauncil <br /> August 15, 2011 <br /> Page 11 <br /> Informatian Seivices. 20Qb. AccessMyLibrary. 31 Jul. 20Q9.) The Caminission's <br /> response to this legitimate concern, i.e,, tl�at this mitigation measure will <br /> 'eliminate any significant environxnental impact, aznounts to no more than a� <br /> proverbial l�ap of faith since the Coinmission ]acks the reports and information to <br /> know if xnitigation wauld be successful (vti+e do not believe it wouid be), <br /> Moreover, the reports and mitigation studies the Commission does have d� not <br /> accaunt for consecutive winter seasoi�s and the attendant long-term effec�s on <br /> erosion and damage from tha degrada�ian that will occur during the development <br /> axad construotion phases of the project. <br /> o The FEIR fai�s to ade,c�uately address potential "generation of exaessive ground- <br /> borne �ibration or ground-borne xioise leveis" {See CEQA Guidelines, Appendix <br /> G, C�QA Environmental Checklist Form), which shou�d be assumed will occur <br /> when, for example, geoiogy mit�gations cal] for "drilled pier foundations and <br /> compacted engineered f�ll." (FEIR Mitigatian Measure Geology-1 noting the <br /> need for drilled pier faundations.} <br /> (c) 1'he Proiect Will Have Sisnificant Cumulative Ympacts That Have Not Been <br /> Identified. Analvzed. or Mih�ated <br /> In addi�ion to an analysis of the �roject's impacts on baseline condition, CEQA requires the EIR <br /> �xamine curraulative impacts of other projects on the subject site. (CEQA Guidelines, § 15130.} <br /> It is important to note that the curnula�ive i��pacts of irhe proposec3 project have not yet been <br /> addressed. For exa�mple, there appears ta be a significant �evelopmenfi underway on Canyon <br /> Lane, a rural area adjacent to Glenwood Avenue, which itself abuts the steepest area of the <br /> project. At least 10 adjoinuig lots on Canyon Lane are owned by Casey Construction, the last <br /> lat having been acquired by Casey in J'uly 20I l. Recent pre-eonstruction activity indicates <br /> development of the entire area could be irnrninent. The combined development of the Project <br /> and tl�e near�y Ca.�lyon Lane wauld all but surround the property at ar�d end of Glenwoad and <br /> certainly further ifnpact the wildlif�, vegetation and the verdant characteristics of'the project site. <br /> In additian, traffic wili be significantly increased st the intersections of Highland and Canyon <br /> Koad, and at Higliland and Jeffersan Ave��ue. <br /> 9 Casey Constructiqn has pre�iously served as a contractor to the City in conneclion with various stonn drain <br /> improveinent projects worth nearly $1 miilian. <br />