Laserfiche WebLink
8.A. - Page 128 <br /> �� ,q� ��� Technical Consulietion, �ata Analysis and <br /> ��� Litigation Support for the �nvironment <br /> 2503 Eastbluff Dr., Suite 2Q6 <br /> I�ewpar# Seach, Califorr�ia 904�5 <br /> Matt Hagem�nn, P.G, Ch.G. <br /> 7ei: (949) 887-9013 <br /> Email: mha�emannf�swar�e.cnm <br /> August 15 aasi <br /> Via Electronic Mail and Facsimile <br /> Sailesh Mehra <br /> Associate City Plar�ner [smehra@redwoodcity <br /> City of Etedwood City <br /> Planning, Housing and �conamic Development Department <br /> 1,�17 Middle�`ield Road <br /> Redwood City, CA 94053 <br /> Subjett: Comments on the Praposed Laurel Way De�elopment <br /> pear Mr. Mehra: <br /> At the reques# af the Laurel Way Area Neighbors Association, I ha�e re�iewed the August 20�.0 <br /> Final Environmer�tal fmpact Report (EIRJ and the February 2010 Draft EIR fvr the Laurel Way <br /> Planned De�elopment in Rec�wood City, California, alor�g rrvith supporting documents. My <br /> re�iew focused on the Geology and Soils and the Hazards and Hazardous Materials sections. 1 <br /> have found the Draft ar�d Final �IRs to inadequately disclose, and therefore mitigate, landsliding <br /> hazards and potential soil contamination issues. Prior ta certification of the EIR, supplemental <br /> studies should 4�e conducted to assess these issues and to identify mitigation rneasures to <br /> ensure pratectior� of property and public health. <br /> ������r�� �� ��������� ����������� �����r��4 <br /> 1. ��idence for a large, deep-seated rotational or translationaf landslide complex in the <br /> eastern area of the de�elopment is not addressed in the DEIR, In an August 5, 2011 <br /> reconnaissance trip to the Laurel Way area, k nated (see figure below and attached <br /> photos): <br /> ' Geolflgic and Geotechnical Feasibili#y E�aluation Laurel Way De�elopment, July 6, 2007; <br /> Supplemental Geolagic and Geotechnical Feasibility EvaEuation Lau�el Way De�elapment, Ottober 26, 2008; and <br /> Phase I EnvironmEntal Site Assessment, Laurel Way Joint Venture Development, August 25, 2408. <br />