My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-09-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 8:44:34 AM
Creation date
9/8/2011 5:43:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. 1. F. - Page 66 <br />two (2) Owners if the meeting has not been called within fifteen (15) days of the damage or destruction <br />and the Secretary shall give thirty (30) days written notice of the meeting to each Owner and his <br />Mortgagees of record. Said Owners meeting shall be held at a suitable location on the Development or as <br />close thereto as practicable which location shall be specified in such notice. <br />(b) The Development shall be repaired or reconstructed in substantial accordance <br />with the latest available construction plans and specifications as hereinafter provided unless in such <br />special Owners meeting at least three - quarters (3/4) of the total voting power of each class of Owners <br />casts votes against such repair or reconstruction in which event the provisions of Section 9.13 shall <br />immediately become applicable. <br />(c) Unless, in the manner provided above, the requisite number of votes are cast <br />against such repair or reconstruction, all of the insurance proceeds payable on account of such damage or <br />destruction shall be deposited with a commercial lending institution experienced in the disbursement of <br />construction loan funds (the "Depository "). The Depository shall be appointed by the Association. Such <br />funds shall be disbursed in accordance with the normal construction loan practices for the Depository and <br />which shall be reasonably acceptable to the Board. The restoration or reconstruction shall be substantially <br />in accordance with the latest available construction plans and specifications for the Development <br />modified as may be required by available materials, state of the art construction and applicable building <br />codes and regulations in force at the time of such repair or reconstruction or in accordance with such other <br />plans and specifications as may be approved by a majority of all Owners; provided, however, any <br />Owner's requested modification to the latest available construction plans and specifications of his Unit <br />shall be approved unless (i) the cost of construction pursuant to the modification exceeds the cost of <br />reconstruction according to the latest available construction plans and specifications, (ii) it affects the <br />Common Area, or (iii) it affects the square footage of, permitted use of, utility service to, easements in <br />favor of or number of Units. <br />(d) The Association shall designate a construction consultant (the "Construction <br />Consultant "), general contractor (the "General Contractor ") and architect (the "Architect ") for the repair <br />or reconstruction contemplated by this Section. <br />(e) The insurance proceeds payable on account of such damage or destruction shall <br />be deposited with the Depository and shall be disbursed in accordance with the normal construction loan <br />practices of the Depository upon the receipt of appropriate mechanics lien releases and upon the <br />certification of the Construction Consultant, the General Contractor and the Architect dated not more than <br />ten (10) days prior to any such request for disbursement setting forth the following: <br />(1) That all of the work completed as of the date of such request for <br />disbursement has been done in compliance with the approved plans and specifications; <br />(2) That such disbursement request represents monies which either have <br />been paid by or on behalf of the Construction Consultant, the General Contractor or the Architect and /or <br />is justly due to contractors, subcontractors, materialmen, engineers or other Persons (whose name and <br />address shall be stated) who have rendered or furnished certain services or materials for the work, giving <br />a brief description of such services and materials and the principal categories thereof, the respective <br />amounts paid or due to each of said Persons in respect thereof and stating the progress of the work up to <br />the date of said certificate; <br />(3) That the sum then requested to be disbursed plus all sums previously <br />disbursed does not exceed the cost of the work insofar as actually accomplished up to the date of such <br />certificate; <br />56 <br />CCRS -One Marina. docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.