My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 ValleyCrest Landscape Maintenane, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 ValleyCrest Landscape Maintenane, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2011 4:31:50 PM
Creation date
9/22/2011 4:31:49 PM
Metadata
Fields
Template:
Agreement
Contractor Name
ValleyCrest Landscape Maintenane, Inc.
PROJECT NAME
Redwood City Recycled Water Project-Phase 1 Redwood Shores Customer Site Retrofits-Bid Package 5
RMP File Number
304
Date
9/22/2011
MO Ref
11-133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
` � �°' �' . <br /> �" � � ` ORIGINAL <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> REDWOOD CITY RECYCLED WATER PROJECT — PHASE 1 <br /> REDWOOD SHORES CUSTOMER SITE RETROFITS - BID PACKAGE 5 <br /> THIS AGREEMENT, made this �i' of �! 2011, by and <br /> between ValleyCrest Landscape Maintenance, Inc. se place of business is at <br /> 825 Mabury Road, San Jose, CA 95133 hereinafter calied "CONTRACTOR", and the City of <br /> Redwood City, a Charter City and municipal corporation of the State of Califomia, hereinafter <br /> referred to as "CIN". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> ,A. Contractor shall complete all Work spec�ed in the Contract Documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract Documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract Documents, as the amount of Three hundred forty <br /> nine thousand three hundred seventy five and 52/100 Dollars ($349,375.52) — <br /> computed in accordance with Contractor's Accepted Proposal dated July 20, 2011 <br /> which Proposal is incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor fumished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or othervvise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in 5ection 00550 (Notice to <br /> Proceed) and Section 00700 {General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within One <br /> Hundred and Fifty (150) Calendar Days from the date the Contract Time <br /> commences to run. <br /> � <br /> REDWOOD SHORES RECYCLED WATER CUSTOMER SITE RETROFITS BID PACKAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.