My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 RC Peninsuola Park, LLC-Stormwater Treatment Maaintenance Measures One Marina
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 RC Peninsuola Park, LLC-Stormwater Treatment Maaintenance Measures One Marina
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2011 2:21:33 PM
Creation date
10/3/2011 2:15:37 PM
Metadata
Fields
Template:
Agreement
Contractor Name
RC Peninsula Park, LLC
PROJECT NAME
One Marina Stormwater Treatmetn Measures Maintenance Agreemetn
RMP File Number
606
Date
9/21/2011
MO Ref
11-151
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NMI1 :1111111iC i <br />STnA , <br />www.StormTrap.com Precast Concrete Modular Slows Water Manage{ enI Sys (on is 1-877-867-6827 <br />9. Summary <br />Proof of all inspections and subsequent maintenance is the responsibility of the property owner. All <br />inspection reports and data should be kept on site or at a location whore they will be accessible for gears <br />in the future. Some municipalities require those inspection and cleaning reports to be forwarded to the <br />proper governmental permitting agency on an annual basis. <br />Defer to your local and national regulations for any additional maintenance requirements and schedules <br />not contained herein. Inspections should be a part of your standard operating procedure. <br />SINGLErRAPCET THE PRECA S T ADVANTA GE! DousLErimp <br />
The URL can be used to link to this page
Your browser does not support the video tag.