My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Corrpro Companies, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Corrpro Companies, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2011 12:55:02 PM
Creation date
11/7/2011 12:55:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Corrpro Companies, Inc.
PROJECT NAME
Cathodic protection for the buried ferrous metal pipeline components of the sanitary sewer collector system in Redwood Shores
RMP File Number
304.5
Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' EXHIBIT A- SCOPE OF SERVICES, TIME AND FEE SCHEDULES <br /> Corrpro Companies, Inc. shall perform work to provide adequate cathodic protection for the buried <br /> ferrous metal pipeline components of the sanitary sewer collector system located in Redwood Shores. <br /> Corrpro Companies, Inc. shall provide all required labor, material, equipment and drilling required to <br /> install anodes, panel boards, wires, etc. for the project. The new anodes, panel boards and extension of <br /> cable lead wires shall be installed at fifteen (15) existing locations. Replacement of the panel board and <br /> extension of cable leads shall be installed at four (4) existing locations. <br /> The Consultant shall: <br /> 1. Drill ten (10) inch diameter holes drilled to a depth of seven (7) feet to install the anodes. <br /> 2. Backfill the holes with native soil to a level of two (2) feet above the anode. <br /> 3. Fill remaining drilled hole with Class 2 aggregate base material and tamped to obtain good <br /> compaMion to achieve 903'o relative compaction. <br /> 4. Submit material submittal for review prior to starting work. The anodes, panel boards, test <br /> stations and cables shall be provided in accordance with City's Standard Specification Section <br /> 02661 and Detail W-16 <br /> 5. Repair top surface for each hole with hot asphalt. <br /> 6. Conduct a�nal survey and supply an updated report. <br /> All of the work shall be done in the best workmanlike manner, conforming to all applicable standards, <br /> specifications, codes, laws, and regulations. <br /> Deliverables: Final Report <br /> Time Schedule <br /> The schedule for the work shall be as follows; however, it may change depending on the site access. <br /> ,...,, ,_ _ _., . .,. _. _ <br /> � D_,ay ,_� „_ �_ � Dater�� _ Activity/, ._ �� � <br /> - '- -. ' - __ : .�_ _: : _. <br /> 1 •10/17/11 Job Kickoff Meeting, Mark area for USAs <br /> 2 10/18/11 <br /> 3 10/19/11 <br /> 4 10/20/11 USAs valid, Mobilize and begin work-1 ATS <br /> 5 10/21/11 2 ATS <br /> 6 10/22/11 ---Weekend--- <br /> 7 10/23/il ---Weekend--- <br /> 8 10/24/11 2 ATS <br /> 9 10/25/11 2 ATS <br /> 10 10/26/11 2 ATS <br /> 11 IO/27/i1 2 ATS <br /> 12 10/28/11 2 ATS <br /> 13 10/29/11 ---Weekend--- <br /> 14 10/30/11 ---Weekend--- <br /> 15 10/31/11 2 ATS <br /> 16 11/1/11 1 ATS, 1 CTS <br /> 17 11/2/11 2 CTS <br /> 18 11/3/11 1 CTS, Demobilize <br />
The URL can be used to link to this page
Your browser does not support the video tag.