My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Wreco, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Wreco, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2011 12:03:29 PM
Creation date
11/30/2011 12:02:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wreco, Inc.
PROJECT NAME
Engineering Consultation for Bayfront Canal Drainage Improvements
RMP File Number
304.5
Date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� EXHIBIT A— SCOPE OF SERVICES AND TIME SCHEDULE <br /> A detailed scope of work and required tasks are provided below: <br /> TASK 1 - PROJECT MANAGEMENT <br /> WRECO shall maintain the fiscal health of the project, manage and supervise the <br /> design team, maintain the project schedule and conduct quality control of all <br /> calculations, studies, investigations, analyses and plans. <br /> PROJECT MEETINGS AND COORDINATION <br /> WRECO shall conduct the following meetings at a minimum, which are critical to the <br /> success of this project: <br /> • Project Kickoff & Field Review Meeting: WRECO shall hold a project kickoff <br /> meeting combined with a field review of the site location. This meeting will be <br /> attended by members of the design team and the City. This meeting will set <br /> the parameters of the project and include the discussion of any design issues. <br /> . Design Concept Meeting: WRECO shall present to the City the conceptual plan <br /> for the project, highlighting the design concept and key features. <br /> . Review Meetings with the City: One (1) City-scheduled meeting shall be held <br /> after the 65% PS&E submittal to discuss and clarify any City comments. <br /> . Design Team Meetings: Intemal meetings with the design team as needed to <br /> discuss and coordinate any design issues. <br /> Deliverables: Exhibits and Meeting Minute <br /> TASK 2 — BASE MAPPING <br /> . WRECO shall compile mapping on base plans, using system mapping and as- <br /> built information. <br /> • Request and obtain utility system mapping from local utility companies. Compile <br /> mapping on base plans, using system mapping, as-built information and visible, <br /> as well as surveyed locations of surface utility facilities, as needed. <br /> . Conduct extensive field reconnaissance to assess the existing site conditions. <br /> TASK 3 PRELIMINARY DESIGN <br /> WRECO shall pertorm the following tasks prior to the start of design: <br /> • Verify hydraulic calculations and revisit the previous studies prepared for the <br /> City. Assess options of adding sheet piles to the south side of Bayfront Canal <br /> and the removal of the tide gates. <br /> • Prepare preliminary construction cost estimates to verify adequacy of budget. <br /> Pertorm value engineering to provide the City with the optimum solution for the <br /> Project. <br /> . Perform topographic survey of existing drainage systems needed and cross- <br /> sections of Atherton Channel <br /> • Coordinate and Prepare Geotechnical Memorandum <br /> • Review and analyze the available geotechnical information <br /> . Establish soil parameters for the design of the sheet pile wall <br /> • Design of the sheet pile wall <br /> • Establish contractibility issues and recommend methods of construction <br /> nmrncwzo».�o�nn�co �o <br /> �o�o» - <br />
The URL can be used to link to this page
Your browser does not support the video tag.