My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-12-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 8:43:35 AM
Creation date
12/13/2011 2:08:51 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. B. - Page 13 <br /> EXH[B[T "A" � <br /> SCOPE �F' S�RV[CES <br /> Middlefield Road Underground 11#ility District 2011-5 Project <br /> Design Scope of Worlc <br /> PR�JECT DESCRIPTION: <br /> Consultan� shall pra�ide design and engineering services for the Middlefield Road lJnderground <br /> Utilities District 2011-1 Project. The objectives of the Middlefield Road Underground Utilities District <br /> 2011-1 �roject are to retno�e existing averhead utility strt�ctures; instali facilities for supplying electric, <br /> comm�nication, and similar services tanderground; and make streetscape improvemer�ts that inerease <br /> pedestrian and bicyclist's mobility. The project area is defined as the length of Middlefield Road <br /> between Main Street and MacArthur Avenue. <br /> �or the first phase of this agreernent, the Consultant shall specificalEy provicie design and engineering <br /> services for this project ta include aerial topography. utility surveying, legal descrip�ior�, and procfuction <br /> of the Joint T'rench Intent Drawing. The Joint Trench Intent Drawing shall shaw the Ci�y's preferred <br /> praposed utility trench alignr�ent and the street 9ayaut. TF�e affected utifity campanies' (PG&E, AT&T, <br /> Comcast, Astound) will use these Jofnt'Trench Intent drawings ta prepare their indi�idual �tility design <br /> f�r their underg�'ourtd faeilities. Based on discussions witft PG&E, their design will take up to two years . <br /> to complete (5�ar�mer 2014). <br /> lJpon comp€etian of the utility companies design for their facilities, to the City may amend this <br /> agreement to inelude finalizing the composite joint trench drawings, preparing "�orm B", finalizing the <br /> streetscape de5ign, and construction support services. � <br /> DE51GN: <br /> TASK 1—AERIAE. TOPOGRAPMY <br /> Consultant shall: <br /> 1. S�t flight crosses for aeria! topography using horizantal and �ertical controls tied to City's basis <br /> of bearing and bench. <br /> Deliverable: <br /> a. 1"�40`scale map of tity right-of-way Far distriet and streetscape improvements shall be <br /> submitted wit�in five (5) weeks frarr� Notice to Proceed (NTP). <br /> TA5K 2—UNDERGROUND U71LI7Y LOCATING AND MAPPING <br /> Cansultant shall: <br /> 1. Perforrn field survey to identify detectable subsurface interferences where project pla€�rting <br /> and construetion activities are proposed. � <br /> 2. Probe accessible s�orm drains and sanitary sewer lir�es. ' <br /> 3. Investigate �roposed f�oring locations and su6surface obstructions. � <br /> 4. Surface t� detected electrical lines with red spray paint. <br /> 5. Surface trace subsurface features according to APWA cade. <br /> A�TYIAGR12�1'(.927/DSA BELLECCI 110000.�OC <br /> FtEV: 11/�6/1 � 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.