Laserfiche WebLink
6.1. C. - Page 14 <br /> Delivera�ie: Due se�er� (7) weeks after completing survey. <br /> a. 65% Plans using format acce�table for submitting Caltrans Encroachment Permit. <br /> Cflnsuitant shall use Caltrans fo�ts and line ty�es on a City Borcfer. The proposed <br /> list of drawings incEudes but is nof limited to: <br /> i. Co�er Sheet <br /> ii. Typical Sections <br /> ii�. Layout & Survey Control <br /> iv. Demolition Plans <br /> v. Civil fmprovement Plans <br /> vi. Storm Drain Profiles <br /> vii. Curb Return Profiles <br /> vaii. Civil Details <br /> ix. Traffic Signal Plar� <br /> x. Traffic Sigr�al Schedule <br /> xi. Signing & Striping Plan <br /> b. 65% Technical Specificat�ons (CSI Master Specs) <br /> c. 65% Cos� es�imate formatted consistent v►►ith the intended final Bid form. Clearing & <br /> Grubbing shall be lump sum along with earthwork. <br /> d. Ten (10) co�ies of Plans to Cify for re�iew eight (8) weeks from completio� of survey <br /> . . . mapping _. . . .. - <br /> TASK 3: SPRUCE STREET MEETING <br /> Consultant shall: <br /> 1. Attend publie presentation to Spruce Street neighbors to reuiew project layout. The <br /> presentation shall inform the public of the chartges and answer questions regarding <br /> the streef closures wit� rofled curbs for �ire Departmer�t. City staff wi11 notice <br /> meeting. <br /> Del��erable: <br /> a. Community meeting three {3) weeks after 65°/a submittal <br /> b. Presenta#ion board of a 1"�10' Sca�e Pfot of the intersectian design with the axisting <br /> aerial topography background. High[ight the new curbs and the changes in traffic <br /> mouemer�ts <br /> c. Presentation board of 5pruce Street photos <br /> TASK �4: 95% SUBMITTAL (CALTRANS & CiTY SUBMETTAL) <br /> Consultar�t sha[I: <br /> 1. Revise plans, technical specifications ar�d estimate based on eomment from Ci�y <br /> and Calfrans assuming only minor geometry changes will be required for the 95% <br /> plans. The drainage plans shal! ir�elude adjustments to existing inlets based on new <br /> curb re#urn alignment. New tr�nk lines and storm drain ex�ensions are not required. <br /> 2. City has already com�feted a thorough preliminary design phase tt�at included <br /> de#ailed traffic study with extensive review that recei�ed a favorable reaction from <br /> Caltrans s#aff r�garding proj�ct parameters and design solution. Therefore, this <br /> scope of work ass�ames Caltrains will streamline their review process for this project. <br /> ATTYIAGR12091.1281 Bellecci 70794 <br /> REV: 11118f11 Page 11 of 14 <br />