My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso11 PC 11-01 May 3 2011
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2011
>
Reso11 PC 11-01 May 3 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 9:30:13 AM
Creation date
12/19/2011 1:45:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/3/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Mixed Use Corridor District <br />Zoning Ordinance Amendment <br />i. Trail width. A creek trail shall be provided along the existing top -of- bank. The trail right - <br />of -way shall he 14 feet pride. <br />4 TOP of BANK <br />.00 2'x-1 2Y AL t BANK <br />SETBACK DG SMOOTH DG <br />SURFACE <br />39' <br />CREEICSIDE SETBACK ir REDWOOD <br />[See Sec 53 5(A)(2 ){a }] CREEIt TRAIL <br />Redwood Creek Trait and Cree side Setback <br />ii. Surfacing and lighting. The trail shall consist of 10 feet of asphalt or other smootl <br />surface with two- foot -wide edge bands of decomposed granite; sustainable surfacing <br />materials will be considered subject to Americans with Disabilities Act (ADA <br />requirements and community access considerations. Trail improvements shall include <br />pedestrian - oriented lighting at a minimum spacing of 100 feet on center. Trail surfacing <br />and lighting to be determined by the responsible review authority, and shall be <br />consistent from one property to the next_ <br />iii. other design options, other design options that provide continuous t ra i I access may be <br />considered. These may include cantilevered walkways, subject to review and approval <br />by the U.S. Array Corps of Engineers, State Department of Fish and Game, and any other <br />applicable agency <br />iv. Creek trail connections. A minimum of one private street connection or paseo <br />connection to the Creep Trail shall be provided per project. Additional connections may <br />be required by the responsible review authority, depending upon project size and <br />configuration. <br />Draft —Islay 2011 14 53.3 -- New Streets and Pathways Regulations <br />
The URL can be used to link to this page
Your browser does not support the video tag.