My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Resolution PC 96-1 Flatirons Funding
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
1996
>
Resolution PC 96-1 Flatirons Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 6:18:38 PM
Creation date
1/19/2012 6:06:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
6/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.by locating an employment- generating use .near residential areas, thereby <br />helping to create a more favorable j obs. housing balance. In addition, the <br />Project will .supply and contribute to significant traffic mitigation <br />measures. By helping to reduce traffic congestion, these measures will also <br />.reduce Project impacts on air quality. The Facts in Support of CEQA <br />Finding 2.5.1 hereby are .incorporated by reference. <br />0 o) The City's Circulation Goal is to 'Iml alntain and improve Redwood <br />City's transportation system to the mutual benefit of motor vehicles, <br />public transportation, bicycles, and pedestrians, while reducing .automobile <br />usage by enhancing the attractiveness of alternative transportation modes." <br />The Project will help the City to meet this goal. The design of the Project <br />will encourage pedestrian use and diminish the need for .automobile trips <br />by establishing common area walkways. These walkways link the larger <br />open spaces to each other, .as well as linking the campus to surrounding <br />amenities. The Project developer or its tenants will provide a shuttle <br />service to transport employees to and from the nearest CalTrain station. <br />.Sub ect to City approval, this requirement may be replaced by <br />participation in the existing. shuttle service that serves other commercial <br />properties in Redwood Shores.. The Project will participate in the County <br />Transportation Management Program. The Project will also supply and <br />contribute to significant traffic mitigation measures. The Facts in Support <br />of CEQA Finding 2.5.1 hereby are incorporated by reference. <br />11 One of the City's Motor vehicle Transportation Objectives is to ".allow <br />for the safe and convenient movement and access of motor vehicles in <br />Redwood City, but not at the expense of the environment or the overall <br />quality of life in Redwood City or to the detriment of alternative <br />transportation modes." The Project will .help the City to meet this <br />objective. The design of the Project will encourage pedestrian use and <br />diminish the need for automobile trips by establishing common area <br />walkways. These walkways link the larger open spaces to each other, as <br />well as linking the campus to surrounding amenities. The Project developer <br />or its tenants will provide shuttle service to transport employees to and <br />frorn the nearest CalTrain station. Subject to City approval, this <br />requirement may be replaced by participation in the existing shuttle service <br />that serves other commercial properties in Redwood Shores. Parking for <br />each phase of the Project meets the City's parking requirements. Special <br />care has been taken to minimize the visual impact of both_ garages and <br />surface lots to the Redwood Shores Parkway. This was done by setting <br />the parking structures well within the campus, by landscaping the lots, and <br />by surrounding the roadway edge of the campus with an informal <br />arrangement of trees. The Projects landscape plan will ensure that shared <br />EAGPLNP I.DaC 3 <br />5130196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.