Laserfiche WebLink
6.1.A. - Page 30 <br /> 3.O CoStS <br /> The �stimat�d e�fort and cast to perform the wQr�C is inc�uded in the table �elow. <br /> Other passilale costs identified in the work include: <br /> � Underwater inspections. Cansultant assumes that Redwood cit� will provide <br /> Consultant with �xisting underwater interivr dive inspe�tions. If necessary, <br /> Gonsultant can provide costs fer add�tion�l dives; Consultant would retain a <br /> clean water diver (DiveCorr} far such woric. <br /> • Excavations at Peninsula tanks. Consuftant assumes that Reciwaod City will <br /> provide the equipment and persoranel needed for six excavations, each about 6 <br /> feet deep x 1 � feet long x 15 f�et wide. <br /> • Pot holin�. Consultanf do�s not envision fhe need to pot hole for the existing <br /> work. Should this be required, Cvnsuftant can provide eosts for this wark <br /> (Subtronic). <br /> � Topographic survey, as needed, pos�ibly at the Sequoia Tank site and along the <br /> Carson reservoir ou#let pipe realignment_ <br /> • Final design work for the Peninsula tanks is nat known at this time. <br /> ATTYIAGR12012.0011G&E ENGINEERING Pa�e 28 of 30 <br /> R���•n�r�n�ti� <br /> � <br /> I <br /> I <br />