Laserfiche WebLink
4. Prepare quantities and estimate <br /> 5. Perform independent internal quality control review check <br /> 6. Respond to one round of plan check comments per submittal, and <br /> internal Q/C comments as required. <br /> 4c. Construction Services <br /> . Review contractor materials submittals, mix designs, and shop drawings <br /> . Respond to contractor requests for information (RFI's) and provide <br /> clarifications to plans <br /> . Perform 1-2 site visits as requested, provide documentation. <br /> Task 5. Electrical Engineering: Plan, Coordination & Meetings <br /> 5a. Electrical/ Underground Constructions Documents (30%, 90% and <br /> 7 00%) <br /> CONSULTANT shall: <br /> . pertorm field investigation of site <br /> . participate in coordination meeting(s) with Pac Bell/AT&T/ComcasUPG&E <br /> for possible relocation <br /> . develop electrical construction drawings to replace/relocate any existing <br /> street light(s) and electrical equipment along Middlefield Road where the <br /> relocated storm drain will be installed <br /> . provide cost estimates for the electrical work, construction documents <br /> (30%, 90%, & 100%). <br /> 5b. Electrical Construction Support: <br /> During construction CONSULTANT will review electrical type submittals as <br /> needed, provide o�ce consultation, review change order proposals, and <br /> make one final daytime inspection and punch list. <br /> ATTY/AGR/2011.140/DESIGN AGREEMENT BKF <br /> REV:12/22/11 <br /> Page 15 of 17 <br />