My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2376
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2012
>
Ord 2376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 9:46:58 AM
Creation date
2/9/2012 9:46:57 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
oz/o6/zosz <br /> District and received and considered the recommendations from the Community <br /> Development Director and did hear any and all public comments and objections or <br /> protests that were raised by the owners of property within the above described district <br /> pertaining to designating this area an underground utility district. <br /> NOW, THEREFORE, THE COUNCIL OF REDWOOD CITY DOES ORDAIN AS <br /> FOLLOWS: <br /> Section 1. The foregoing recitals are, and each of them is, true and correct and <br /> constitute the findings in this matter; <br /> Section 2. Said District is hereby established and declared formed, and <br /> designated as "Middlefield Road UNDERGROUND UTILITY DISTRICT NO. 2011-1". <br /> Section 3. The boundaries of the District are hereby fixed and determined as <br /> set forth and described in Exhibit "A". Reference is hereby made to the map of said <br /> District boundaries as depicted on Exhibit "B" hereof, attached hereto and by this <br /> reference incorporated herein, for a general description of the District. <br /> Section 4. Pursuant to Section 11.45 of the Code of the City of Redwood City, <br /> the date by which the undergrounding of all overhead utilities, including existing service <br /> drops, and the removal of all wood utility poles overhead wires and associated <br /> structures from all streets, roads, alleys or ways shall occur within said District is hereby <br /> fixed as December 31, 2016. <br /> Section 5. All existing overhead connection and electrical distribution facilities <br /> in such district shall be removed; each property served from such electric overhead <br /> facility shall have installed in accordance with Pacific Gas & Electric Company's <br /> ("PG&E") rules for underground service, all electrical facility changes on the premises <br /> necessary to receive service from the underground facilities of PG&E as soon as <br /> available. <br /> Section 6. PG&E is authorized to disconnect its overhead service 30 days <br /> after completion of the installation of underground facilities. <br /> Section 7. Pursuant to Section 11.45(d) of the Code of the City of Redwood <br /> City, the date by which all affected property owners must provide for services from <br /> underground facilities is fixed as 30 days prior to removal of all overhead utilities, <br /> including existing service drops, wood utility poles, overhead wires and associated <br /> structures. <br /> Section 8. Pursuant to Section 11.45(e) of the Code of the City of Redwood <br /> City, the following facilities may be maintained above-ground: transformers and <br /> pedestal-mounted service terminals. <br /> ATTY/ORD.365/MIDDLEFIELD UUD ORD. # 2376 <br /> REV:01/10/12 FORMERLY MUFF 804 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.