Laserfiche WebLink
8. B. - Page 169 <br /> PREFACE <br /> This docuinent responds to coinment letters received on the Final Environmental Impact Report <br /> (FEIR) for the 2580 El Camino Real Residential project. The FEIR was circi�lated to public agencies <br /> a��d interested parties that conu7�ented on the Draft EIR for a 10-day review period from December 2, <br /> 2011 to December 13, 2011. Tlus volume consists of supplemental comments received by the Lead <br /> Agency on the FEIR dL�ring the pL�blic review period a�7d responses to those conuilents as well as two <br /> letters of appeal on flie Pla�u�ing Comnussion's certification of the EIR and related approvals. The <br /> City has no legal obligation to respond to comments subnutted outside the pl�blic conunent period; <br /> however, the City elected to provide written responses to the sL�pplemental comments u� an effort to <br /> be inclusive and provide fi�ll disclosL�re. <br /> CEQA Guidelines Section 15088.5 states that: <br /> "A lead agency is required to recirculate a�� EIR when significant new u�formation is added to the <br /> EIR after public notice is given of tlie availability of t11e draft EIR for public review under <br /> Section 15087 but before certification. As L�sed ul tlus section, the term "u�formation" can <br /> incll�de changes in the proj ect or environmental setting as well as additional data or other <br /> infornlation. New information added to a�1 EIR is not "significa��t" unless the EIR is cha��ges in a <br /> way that deprives the pL�blic of inea�lingfial opportunity to conullent upon a substantial adverse <br /> enviromnental effect of fl7e project or a feasible way to mitigate or avoid sL�ch a�� effect <br /> (including a feasible project alternative) that the project's proponents have declined to <br /> implement. "Sigiufica��t new ulformation" requiring recircL�lation ulcll�de, for exa�l�ple, a <br /> disclosure showing that: <br /> 1. A new significa�lt environn�ental impact would resl�lt from the proj ect or from a new <br /> initigation measL�re proposed to be iinpleinented. <br /> 2. A sL�bsta��tial increase in the severity of a�� envirom�lental impact would result tu�less <br /> nutigation ineasL�res are adopted that reduce the iinpact to a less than significant level. <br /> 3. A feasible proj ect altei7lative or nutigation ineasL�re considerably different from others <br /> previously analyzed would clearly lessen the significant environmental impacts of fl7e <br /> project, but the project's proponents decline to adopt it. <br /> 4. The draft EIR was so fi�ndamentally a�ld basically inadeqL�ate and conclusory in nature <br /> that meaningful public review and conullent were precluded. <br /> Recirculation is not required where the new information added to the EIlZ merely clarifies or <br /> a�nplifies or makes insigiufica��t modifications ul a�1 adequate EIR." <br /> The suppleinental comments received do not provide any new information, do not identify a�ly new <br /> significant impacts or mitigation measures, do not show a substantial increase in fl7e severity of an <br /> already identified envirom�lental impact, and do not precli�de meaningfi�l pi�blic review and comment <br /> on the proj ects impacts. <br /> The comments are orga��ized Lulder headings containing the source of the letter a��d the date <br /> subnutted. The specific comments from each of the letters are presented as"Conuilent" with each <br /> response to that specific comment directly followulg. Each of the letters sL�bmitted to the City of <br /> Redwood City are attached in their entirety (with any enclosed materials) in Section II of this <br /> docL�ment. <br /> This document is part of the public record for the above referenced project and has been provided to <br /> the City CoL�ncil as such for consideration durulg the appeal process. <br /> 2580 El Cainino Real Residenrial Project 1 Response to Conmients Recei��ed on Final EIR <br /> Cin� of Red��ood Cin Jannai� 2012 <br />