7. Environmental Considerations and Potential Effects <br /> 8. Legal and Institution Requirements <br /> 9. Financial Capacity of Sponsor <br /> 10. Research Needs <br /> WBA will prepare a Feasibility Study consisting of an executive summary and a USBR <br /> "crosswalk," which is a matrix that lists the specific citation in the reference documents for each <br /> piece of information that the D&S requires. <br /> WBA's will maacimize the use of existing information in preparing the Title XVI Feasibility <br /> Study. This scope assumes that portions of the information required by the D&S are available in <br /> the Redwood City 2010 Urban Water Management Plan; the recent Update to the City's 2002 <br /> Water Recycling Feasibility Study prepared by Kennedy/Jenks; and recycled water project <br /> environmental documents. As part of this scope WBA will conduct the studies to provide the <br /> balance of the needed information for those sections. <br /> Task A.1— Information Gatherinr and Chrono[orv ofExistinr Studies and Renorts <br /> WBA will review copies of reports, studies and other reference material provided by the City and <br /> other readily available sources and will prepaze a chronology based on the "crosswalk." A list of <br /> needed information will be identified along with an approach by which it can be obtained. <br /> Task A.2 — Prenare Sections with Available Information <br /> Using the readily available information and chronology, WBA will prepare the crosswalk and <br /> supporting material for as many sections and sub-sections as possible. Specifically what sections <br /> will be completed using existing information will not be known until Task A.l is completed. <br /> This scope of work and budget assumes that sufficient information exists on which to complete <br /> the following sections or subsections: <br /> Section 1 Introductory Information <br /> Section 2 Statement of Problems and Needs <br /> Section 3 Water Reclamation and Reuse Opportunities <br /> Subsections 4a, 4b, 4e; parts of 4d - Description of Alternatives <br /> Section 7 Envirorunental Considerarions and Potential Effects <br /> Section 10 Research Needs <br /> Task A.3 — Alternatives, Economic Analvsis and Justificarion <br /> Based on general conversations with the City and the team's knowledge of the existing project <br /> documents, WBA concludes there aze severa] sections that will require original work to be <br /> prepazed to complete the D&S. WBA team will prepare a memo on these subjects that will be <br /> referenced in the crosswalk. <br /> Section 4- Description of Alternatives: (4c) a description of other water supply alternatives <br /> considered (including impaired surface and groundwater), (4d) a cost estimate for the <br /> alternatives; operation, maintenance and replacement cost for the project; and (4� distribution <br /> alternatives. Kennedy Jenks identified distribution alternatives that were not included in the <br /> Feasibility Study Update. A memo will be prepared that presents these alternatives and their <br /> costs estimates. <br /> Agreement over $10K 1 1 <br /> City Attomey Approved Version 091211 <br />