Laserfiche WebLink
EXHIBIT "A" <br /> SCOPE OF WORK: <br /> TASK 1: REVIEW DATA AND REPORTS <br /> Moffatt & Nichol shall review existing data and engineering reports that have been <br /> generated from the study of flooding in the Bayfront area and potential mitigations. <br /> The data/reports are as follow: <br /> . Topographic LIDAR survey and as-built drawings of the Flood Slough tide gate; <br /> . Winzler and Kelly Hydraulic study (2003); <br /> . WRECO Hydraulic study (2011). <br /> TASK2: FEASIBILITYANALYSIS <br /> Moffatt & Nichol shall: <br /> 1. Develop stage versus storage relationships for the three managed ponds (S5, <br /> R5, & R3) from the available LIDAR data. <br /> 2. Perform hydraulic analysis to determine the hydraulic grade lines from the <br /> Bayfront Canal, through the managed ponds, and then out to Flood Slough. <br /> Potential locations for tide-gates and culverts to route flows back into Flood <br /> Slough will be considered. Grading of the managed ponds to facilitate the project <br /> will also be considered. <br /> 3. Pertorm statistical analysis to determine the frequency of occurrence for various <br /> combinations of rainfall and high tide events, which will be used to estimate stage <br /> and capacity of the ponds and resulting reduction in flood stage in Bayfront <br /> Canal. Flood flows and stages associated with lower frequency precipitation <br /> events will be derived from the existing hydraulic and hydrologic studies. The <br /> recurrence-interval of tide levels in Flood Slough will be derived from existing <br /> studies and from available tide data in the Bay. <br /> 4. Conduct water quality sampiing to document background levels of contaminants <br /> in Bayfront Canal. <br /> 5. Document approach and results. <br /> TASK 2 DELIVERABLES: <br /> . Preliminary Feasibility Analysis Report <br /> . Water Quality Sampling Results <br /> SCHEDULE: <br /> Preliminary Feasibility Analysis Report shall be provided within 4 weeks of Notice to Proceed. <br /> Water quality sampling is weather dependent, a nd shall be provided as soon as practical. <br /> ATTY/AGR/2012.016/MOPFATT NICHOL Page 10 of 11 <br /> REV: VR 02/O6/12 <br />