My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 ICF Jones & Stokes, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 ICF Jones & Stokes, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2012 12:17:43 PM
Creation date
3/12/2012 12:17:42 PM
Metadata
Fields
Template:
Agreement
Contractor Name
ICF Jones & Stokes, Inc.
PROJECT NAME
CEQA Study- Costco Review
RMP File Number
304.5
Date
3/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
applicable procedures and requirements of the Bay Area Air Quality Management <br /> District (BAAQMD). In the event that our review of the technical analysis indicates that <br /> additional analysis is required, ICF will identify the revisions necessary to satisfy <br /> BAAQMD requirements for CEQA. This scope does not include any quantitative <br /> analysis by ICF of air quality or greenhouse gas emissions. <br /> Noise Impacts <br /> ICF will utilize the analysis in the 2006 EIR and the Preliminary Transportation Assessment Memorandum <br /> to evaluate potential noise impacts that may result from the proposed project. Due to the relatively low <br /> increase in projected vehicle trips associated with the proposed project, it is assumed that a qualitative <br /> noise analysis will be adequate. <br /> Transportation and Circulation Impacts <br /> ICF will utilize the analysis in the 2006 EIR and the Preliminary Transportation Assessment Memorandum <br /> to evaluate the potential traffic and circulation impacts that may result trom the proposed project. <br /> Defiverables <br /> s The draft Environmental Checklist in electronic MS Word and PDF format <br /> Assumpfions: <br /> ■ All technical studres would provide ihe required quanCi,ative anafysrs necessary to Avaluate po:erttial <br /> noise and transportalian and traffic analysis �mpacfs resulting'rom the propesed project withouf <br /> additional anafys.�s required by lCF <br /> ■ For scoping purposes tCF has assumed one round ol review by the C+ty fo create the Environmentai <br /> Checklist. <br /> Task 4. Praject Marragement <br /> ICF will be available to attend project coordination meetings with City and applicant <br /> staff, and support City staff at public and Planning Commission meetings. Except as <br /> noted above in Task 2, this scope assumes that ICF staff will attend and City staff will <br /> lead and coordinate the public meetings. <br /> Assump:ior,s: <br /> ATTY/AGR/2012.018/ICF INTERNATIONAL COSTCO REVIEW VR EDITS AND COMMENTS <br /> REV:02-21-12 15 <br /> City Attorney Approved Version 012611 <br />
The URL can be used to link to this page
Your browser does not support the video tag.