My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-10-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:07:56 PM
Creation date
10/23/2003 3:03:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
10/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />J/ <br />beals sport <br />N Otvi StON OF BENLS ALLIANCE <br />September 29, 2003 <br />S. Peter Vorametsanti, P.E. <br />Senior Civil Engineer <br />City Of Redwood City <br />Engineering & Construction <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br />7. I D -3 <br />.- -- 0;;1 i - 2UU3 <br />J <br />_ , <br />C !7 : <br />. _ 3 .' T <br />`tnTtn <br />RE: DESIGN AND CONSTRUCTION ADMINISTRATION <br />Additional Services for Fair Oaks Elementary School Sport Field Improvement Project <br />beals sport Project No.290003 <br />Dear Mr. Vorametsanti, <br />In response to your request, beals sport, a division of beals alliance, is pleased to submit the <br />following proposal to provide Design and Construction Administration Services on the above - <br />referenced project. This proposal reflects the Scope of Additional Work required to provide the City <br />with additional services for design and construction of the Fair Oaks Elementary School Sport Field <br />Improvement and associated work. This additional scope accounts for work above and beyond the <br />proposal from beats sport dated July 24, 2003. The current budget for these improvements is <br />identified at $850,000, not including the sports field lighting design and installation which would be an <br />additional cost of approximately $85,000 to $160,000, depending on the capacity of the existing <br />service. <br />PROJECT UNDERSTANDING: <br />City of Redwood City is proposing to retain beals sport to provide additional Design, Bid and <br />Construction Administration Services for the work required to design sport field lighting for the Fair <br />Oaks Elementary School Sport Field Improvement Project. Primary project scope components will <br />include design and construction services of the electrical system for the sump pumps and installation <br />of sport field lighting and related components, such as the light foundations, and coordination with the <br />lighting manufacturer and DSA, and related bid and construction services such as additional meetings, <br />plan distribution, and addressing miscellaneous bid and construction issues, such as sequencing work, <br />construction conflicts, etc. <br />SPECIFIC SCOPE OF SERVICES: <br />In accordance with our understanding of the project, beals sport (through Salas O'Brien <br />Engineering) proposes to provide the following services. <br />A. Design and Documentation Services <br />1. Retain an electrical engineering design firm to design all electrical related components, <br />including light pole foundations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.