My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-10-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:07:56 PM
Creation date
10/23/2003 3:03:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
10/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Relocate Reinforced Concrete Box Culvert (RCBC) in Downtown Area <br />$256,500 <br />Amendment #3 -BHV Innisfree Ventures I, LLC (Power Engineering G.antractors) <br />Item Description <br />Cost <br />a. Furnish all labor and material to install new 18" and <br />$101,200.00 <br />12" Reinforced Concrete Pipe (RCP) including <br />Subtotal <br />Engineering Support <br />manhole, curb inlets on Jefferson Ave from <br />Grand Total (Rounded) <br />the new RCBC to the existing RCBC <br />b. Remove a section of existing RCBC beneath <br />i $110,300.00 <br />Jefferson Avenue, install bulkhead, backfill, <br />compact, restore roadway and restripe street <br />I <br />C. Remove a section of existing RCBC beneath <br />$45,000.00 <br />Middlefield Road, install bulkhead, backfill, <br />I <br />compact, restore roadway and restripe street <br />Subtotal <br />$256,500 <br />Developer's fee (3 %) <br />.00 <br />$7,500.00 <br />Subtotal <br />$264,195 <br />Contingency (10 %) <br />.00 <br />$25,195.00 <br />Subtotal <br />Engineering Support <br />$289,845.00 <br />Grand Total (Rounded) <br />0,000.00 <br />$ $1$1 0,000.00 <br />Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.