Laserfiche WebLink
Early Investment Proposcoll <br />• Timeframe (2020 ?) <br />• Prop 1A and match funding (up to $213?) <br />• Goals <br />— Electrified Caltrain service <br />— Caltrain feeder service to temporary HSR terminus at Diridon <br />• Caltrain recommended projects <br />— Advanced signal system ($231 M) <br />— Caltrain electrification ($785M) <br />— Electric trains ($440M) <br />— Infrastructure upgrade (TBD) <br />— Rail crossings upgrade (TBD) <br />