My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-11-03
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-11-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:05:52 PM
Creation date
10/31/2003 8:05:46 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
11/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />Attachment I <br />Downtown Fuming Plan <br />The implementation of the Council /Agency Board priorities and actions regarding the <br />Retail /Cinema project, the 0ourthouse Facade Restoration and Plaza Project, and the <br />implementation planning fog the Downtown Plan are incorporated into a multi -year <br />Capital Budget or "Downtown Funding Plan" summarized as follows: <br />Parldng Improvements $19,175,000 <br />Estimated soft costs and construction costs for the underground public parking structure <br />on Block 1; parking control equipment for parking management throughout the <br />downtown; as well as costs for expanding and re- striping Block 2 parking lot. <br />Land Assembly $ 2,000,000 <br />Remaining net land assembly costs to be funded for parking obligations pursuant to the <br />DDA for the Retail /Cinema Project, including Block 1 and Block 2. This amount is net of <br />the developer's $7.5M payment for the air rights to construct the Retail /Cinema project <br />over the parking structure, as well as the monies allocated in the 2002 -03 "Current <br />Capital Projects for parking. <br />Culvert $ 3,800,000 <br />Estimated cost to relocate the culvert so the underground public parking structure can <br />be built. <br />Streetscape Improvements $ 1,675,000 <br />Estimated cost to construct improvements for "Theater Way" between Broadway and <br />Winslow, and modifications to Broadway for proposed protected drop -off for Cinema <br />and Fox Theater. This concept was approved by the City Council /Agency Board in the <br />Joint Study Session in March, 2003. <br />Courthouse Plaza $ 6,483,190 <br />Estimated hard and soft costs associated with the demolition of the Annex on <br />Broadway, the restoration of the facade of the Courthouse, and the construction of the <br />proposed new plaza. <br />Miscellaneous Downtown Projects $ 650,000 <br />Estimated costs to Theater Way 2 (Middlefield between Broadway and Veteran's Blvd); <br />gateway improvements and directional signage for downtown; enhanced public open <br />spaces; Winslow realignment; and improvements to redirect traffic back unto Broadway. <br />These improvements help implement the Downtown Plan and reflect direction received <br />in the Joint Study Sessions with the Council /Agency Board, Planning Commission and <br />the Architectural Review Committee. Money originally budgeted to fund a fountain in <br />the plaza between City Hall and City Center Plaza will be redirected to this project. <br />Development Incentives/Contingency $ 3,067,000 <br />Estimated costs for offsite reimbursements for the Franklin Street Apartments; <br />downtown precise plan; possible incentives for private development projects; and <br />contingency for unforeseen opportunities and expenses. <br />1 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.