My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 American Construct and Supply
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 American Construct and Supply
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2012 3:39:44 PM
Creation date
3/27/2012 3:39:43 PM
Metadata
Fields
Template:
Agreement
Contractor Name
American Construct and Supply
PROJECT NAME
Cathodic Protection System rehabilitation for Seaport Blvd water transmission pipelines
RMP File Number
304.5
Date
3/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� <br /> f <br /> �- <br /> ORIGINAL <br /> AGREEMENT <br /> � forthe <br /> City of Redwood City <br /> CATHODIC PROTECTION SYSTEM REHABILITATION FOR SEAPORT BOULEVARD <br /> WATER TRANSMISSION PIPELINES <br /> THIS AGREEMENT, made this � day of , 201 Zi, tfy and <br /> between American Construct and Supply, Inc whose place of busines is at 45 San Clemente <br /> Drive, Suite A-100, Corte Madera, CA hereinafter called "CONTRACTOR", and the City of <br /> Redwood City, a Charter City and municipal corporation of the State of California, hereinafter <br /> referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract documents. - <br /> ` N <br /> II. CONTRACT SUM �f��"����" <br /> A. City shall pay the Contractor as the "Contract Sum° for completion of Work in ,� <br /> accordance with the Contract documents, as the amount of Forty five thousand two ,� <br /> hundred twenty four a 100 Dollars ($45,224.00) computed in ordance with ��"�� <br /> Contractor's Accepte�e sa4 Bid dated February 1, 2012 which es21 Bid is )�� <br /> incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taues are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within sixty <br /> (60) Calendar Days from the date the Contract Time commences to run. <br /> oosza� <br /> CATHODIC PROTECTION SYSTEM REHABILITATION FOR <br /> SEAPORT BOULEVARD WATER TRANSMISSION PIPELINES <br />
The URL can be used to link to this page
Your browser does not support the video tag.