Laserfiche WebLink
<br />M~ O~ 01 07:12p <br /> <br />WARING CONSTRUCTION, INC. <br /> <br />(650)365-0182 <br /> <br />p.2 <br /> <br />\91 ~~~~~ INC. <br /> <br />PROPOSAL <br /> <br />NAME: City of Redwood City JOB NAME: BCDC Observation Decks with Access Walks <br />ATTN: S. Peter Vorametsanti Address: Gossamer Isle <br />STREET: 1017 Middlefl8ld Rd. Redwood Shores <br />CITY: Redwood City PROPOSAL#¡ 0166 <br />STATE: CA DATE: 4.26-01 <br /> .. <br />ZIP: 94064 ESTIMATOR: Ralph Waring <br /> .-.- <br />PHONE: 780-7388 Fax 650-556-9262 <br /> <br />WORK TO BE PERFORMED: <br /> <br />1. Decks and ramps- Excavate soil, provide and install epoxy coated #5 <br /> rebar, place and finish concrete per plans. Provide and install Douglas Fir <br /> pressure treated S"x 12" #1 posts, 4"x 12" girders, 2"x 12" joist, 2"x 4" rails <br /> and 4"x 4" posts. Provide and install Con common surfaced redwood 2"x 2" <br /> pickets and 2"x 8" surfaced redwood top cap. Provide and install Douglas <br /> Fir pressure treated 2"x 6" for decking. Set pre-tab concrete bridge. 101,435.00 <br />2. Prefabricated concrete bridge- Provide (1) 10-3" x 71 'long prefabricated <br /> concrete bridge per AASHTO specifications for pedestrian bridges. Price is <br /> based on quote from Excel Bridge Manufacturing. Tax included - 46,457.00 <br />3. Steel- Provide and install W8 x 31 steel moment frame to support concrete <br /> bridge. Provide and install steel Qalvanized handrail. 13,970.00 <br />4. Asphalt- Grade and compact existing sub grade, import and compact 5" of <br /> class II base rock. Lay and compact 2 y,," of asphalt. Install 2"x 4" pressure <br /> treated header board for ADorox. 500'. 28,987.00 <br />5. Wood Benches- Provide and install (7) wood Timber form #2761-S <br /> benches per plans. 9,880.00 <br />6. Wood Trellis- Provide and install all pressure treated material to construct <br /> wood trellis Der detail B on L4.3. 2,592.00 <br />7. Bonding- Provide performance and material bonds per city requirements. 4813.00 <br />8. Supervision and project management 3,000.00 <br /> Sub-total: $ 211,134.00 <br /> Contractor's Overhead and Profit: $ 21,114.00 <br /> TOTAL: $ 232,248.00 <br /> <br />Project to start approx. May 18t and be completed no later than June 30th 2001. <br /> <br />* Includes prevailing wage if necessary <br /> <br />Proposal # O166.doc <br />Page 1 of2 <br /> <br />500 HOWLAND STREET #3. REDWOOD CliY, CA 94063-1144 <br />PHONE: (650) 365-0181 . FAX: (650) 365-0182 . CAL Llc #605799 . WWW.WARINGCO.COM <br />